855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 179

Extracted Content

EAp2: Minimum
Energy Efficiency
Linked EAc2: Enhanced Energy Efficiency
(choose Option 1 OR Option 2)
Available
points
Implement incremental efficiency measures for HVAC, SWH,
lighting, and/or building mass with night flush per_ASHRAE_
90.1-2022, Section 11.
AND/OR

Path 3. Plug and process loads
1–5

AND/OR

+

Path 4. Base building energy efficiency

2
Option 1 or Option 2.
90.1-2019 or 90.1-
2022

ECB Method

Option 1. Prescriptive Path

1–7
Option 1 or Option 2.
90.1-2019 or 90.1-
2022

ECB Method

Path 3. Plug and process loads

1–5
Option 1 or Option 2.
90.1-2019 or 90.1-
2022

ECB Method

AND/OR

+
Option 1 or Option 2.
90.1-2019 or 90.1-
2022

ECB Method
Path 4. Base building energy efficiency

2

Option 1 or Option 2.
90.1-2019 or 90.1-
2022

Appendix G — PRM
Option 2. Energy Simulation
Implement efficiency measures to achieve a percentage
reduction in “future source energy” below a performance Index
Target (PIt).

Initial build-out or substantial alteration. PIt referenced to_90.1-
2019 equivalent performance.

Other alterations. PIt referenced to_ASHRAE 90.1
prescriptive
requirements from referenced version of ASHRAE.
1–12

Option 1. Prescriptive Path

Option 1 offers a streamlined approach to achieving energy efficiency without requiring complex energy modeling. Teams can combine paths under Option 1 to achieve up to 12 points for the credit. This option is particularly beneficial for projects with limited scope, or simple systems, or that or located in inefficient base buildings that detract from overall project performance documented using energy simulation.

The first three paths focus solely on efficiency implemented in the project scope. Path 1 rewards prescriptive method compliance with ASHRAE 90.1-2022 . Paths 2 and 3 reward improved efficiency for regulated loads and for plug and process loads respectively, with points weighted based on the typical distribution of regulated versus plug and process loads addressed in Interiors projects.

Path 4 recognizes energy efficiency in the base building.

PATH 1. ASHRAE 90.1-2022 COMPLIANCE FOR PROJECT SCOPE

Projects earn three points for complying with EAp2: Minimum Energy Efficiency, Option 2 . ASHRAE 90.1-2022 using the prescriptive method, regardless of whether project registration occurs after ASHRAE 90.1-2022 becomes obligatory January 1, 2028.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 168