No further adjustments are required to a BBP model with purchased heat and purchased CHW documented per ASHRAE 90.1-2022, Addendum A in EAp2: Minimum Energy Efficiency .
Combined heat and power (CHP) To limit undue credit for site-recovered energy from CHP with on-site combustion emissions, projects must model CHP systems using one of the following methods instead of ASHRAE 90.1 G2.4.2.1:
-
CHP in baseline and proposed . Model CHP systems including all fuel inputs and associated site-recovered energy identically in the baseline design and the proposed design.
-
Purchased electricity in baseline and proposed . Model purchased electricity instead of the on-site electricity generation. Either credit site-recovered energy from the CHP toward the thermal loads for the baseline and proposed design identically; or ignore the site-recovered energy contribution in the baseline and proposed design).
-
CHP in proposed and purchased electricity in baseline . Model CHP systems including all fuel inputs and associated site-recovered energy in the proposed design. Model the baseline design per ASHRAE 90.1 with purchased electricity and with no credit for site-recovered energy.
DOCUMENTATION
| Project types All | Options All | Paths All | Documentation Demonstrate compliance with EAp2: Minimum |
|---|---|---|---|
All | All | All | Demonstrate compliance with_EAp2: Minimum_ Energy Efficiency. |
All | Option 1 | Path 1 | Demonstrate compliance with_EAp2: Minimum_ Energy Efficiency ASHRAE 90.1-2022, Sections 5– 11. |
All | Option 1 | Path 2: Case 1 | Upload calculator to demonstrate compliance. |
All | Option 1 | Path 2: Case 2 | Upload calculator to demonstrate compliance. |
All | Option 1 | Path 3: Case 1 | Demonstrate compliance that plug load dashboard has been supplied and meets requirements. Examples include screenshots of dashboard, photos, specifications etc. |
All | Option 1 | Path 3: Case 1 | Provide documentation and/or IT policy. |
All | Option 1 | Path 3: Case 2 | Provide documentation installed equipment meets criteria in Table 3 |
All | Option 1 | Path 3: Case 3 | Upload plug and process load exceptional calculation and associated documentation. |
All | Option 1 | Path 4 | ENERGY STAR® certificate; Comcheck or other approved method showing compliance with_ASHRAE_ 90.1 2022 or LEED credits. |