  • On-site renewable systems . Include all Tier 1 systems credited in EAc3: Renewable Energy.

    • Controls . Include systems credited in EAc5: Grid-Interactive.

Additional LEED tasks LEED appends additional required tasks to those referenced in ASHRAE 202-2024 :

MEETINGS During the design phase, the CxP participates in at least one coordination meeting to discuss design review comments.

During the construction phase, the CxP participates in at least two milestone meetings to discuss the commissioning findings and work toward resolution of identified issue.

ONGOING CX PLAN An ongoing Cx plan ensures that systems remain operationally efficient throughout the life of the building. The plan should provide facility managers with procedures, blank FPTs, and a recommended schedule for ongoing Cx activities.

The ongoing Cx plan should address requirements for continuous documentation and updates. Building operations change over time, including retrofits or equipment replacement projects. Ensure the ongoing Cx plan reflects the most current information for the building.

REVIEW OF TRAINING MATERIALS Facility staff training represents a critical step between the construction phase and postoccupancy. Before or during occupancy, the CxP must review training material to confirm that the training documents meet the training plan and sufficiently address the OPR and BOD. The CxP must also confirm that training occurred.

Enhanced commissioning for building enclosure (when in scope) If the project scope includes major alterations to the envelope addressing more than 25% or total building envelope area or more than 5,000 square feet (465 square meters) of the building enclosure, then the commissioning scope must include field testing for water penetration and infrared imaging, using one of the referenced standards.