Option 2. Energy Storage (1–2 points)
Provide on-site electric storage and/or thermal storage meeting the criteria in Table 2.
Include automatic load management controls capable of storing the electric or thermal energy during off-peak periods or periods with low grid carbon intensity, as well as using stored energy during on-peak periods or periods of high grid carbon intensity.
Table 2. Peak storage capacity relative to peak demand
| Storage | 1 point | 2 points |
|---|---|---|
| Electric storage capacity Relative to peak electric demand | 0.2 kWh / kW | 0.4 kWh / kW |
Thermal storage capacity Relative to peak coincident thermal demand (heating + cooling + SWH + process heat) | 1.0 kWh / kW or Btu / Btu/hr or ton-hr / ton | 2.0 kWh / kW or Btu / Btu/hr or ton-hr / ton |
AND/OR
Option 3. Demand Response Program (1 point)
Enroll in a minimum one-year demand response (DR) contract with a qualified DR program provider, with the intention of multiyear renewal.
On-site combustion-based electricity cannot be used to meet the demand-side management criteria.
AND/OR
Option 4. Automated Demand-Side Management (1 point)
On-site combustion-based electricity cannot be used to meet the demand-side management criteria.
PATH 1. SYSTEM-LEVEL CONTROLS (1 POINT)
Provide automated demand response controls for at least two of the following systems installed within the project scope of work:
-
HVAC systems (50% of rated capacity)
-
Lighting systems (50% of power)
-
Automatic receptacle controls (50% of number of receptacles)
-
Service water heating (90% of capacity)
-
Electric vehicle supply equipment
OR
U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 213