855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 233

Extracted Content

maintain life-support conditions. To be eligible for this option, the project must have at least some critical equipment.

The design must include an automatic transfer switch and controls that enables the project to operate the project’s on-site renewable systems, energy storage, and critical equipment in the event of a power outage (referred to as islanding).

DOCUMENTATION

Project

Options Paths Documentation

AllAllAllDocumentation that the technology and controls in place for
energy storage, DR, automated demand-side management,
and power resiliency, as applicable, are within the CxP
scope of work.

All
All
All

Affirmation that the technology and controls in place for
energy storage, DR, automated demand-side management,
and power resiliency, as applicable, are documented in the
project systems manual, or Current Facilities Requirements
(CFR) and Operations and Maintenance (OM) plan.

All
Option 1

Path 1

Documentation showing outdoor air delivery systems with
required energy recovery devices and efficiencies, and_OA_
bypass (e.g., mechanical schedules, specifications,
submittals, controls diagram).

All
Option 1

Path 2


The total project envelope UA calculation and percent
improvement compared to baselines as defined in credit
requirements.

All
Option 1

Path 2


Comcheck or_ASHRAE_ 90.1-2022 prescriptive thermal
bridging compliance forms (as applicable).

All
Option 1

Path 3

Confirmation of air tightness testing and TAB in OPR and
Cx plan.

All
Option 1

Path 3

Air leakage test report describing method, conditions, and
results. For renovation projects; Test results from before
and after alterations for projects in existing buildings
attempting to show air leakage reductions.

All
Option 2
All

Calculation showcasing achievement of point threshold.
(Estimated Energy Use, Peak Demand, Storage Capacity,
Peak Storage Capacity Relative to Peak Demand).

All
Option 2
All

Narrative documenting the automatic load management
controls.

All
Option 3
All

Proof of enrollment in DR program.

All

Option 4

Path 1

Identification of systems with automatic DR controls and
calculation showing required thresholds have been met.

All

Option 4
Path 2
Project total peak electricity demand and total percentage
of load included in the load shedding program.

All

Option 4
Path 2
Description of how the project will shed 10% of the peak
demand for one hour and what triggers the event. (e.g.,
short narrative, Sequence of Operations, etc.).

All

Option 4
Path 2
BAS sequence of operations illustrating demand
management for building equipment.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 222