maintain life-support conditions. To be eligible for this option, the project must have at least some critical equipment.
The design must include an automatic transfer switch and controls that enables the project to operate the project’s on-site renewable systems, energy storage, and critical equipment in the event of a power outage (referred to as islanding).
DOCUMENTATION
Project
Options Paths Documentation
| All | All | All | Documentation that the technology and controls in place for energy storage, DR, automated demand-side management, and power resiliency, as applicable, are within the CxP scope of work. |
|---|---|---|---|
All | All | All | Affirmation that the technology and controls in place for energy storage, DR, automated demand-side management, and power resiliency, as applicable, are documented in the project systems manual, or Current Facilities Requirements (CFR) and Operations and Maintenance (OM) plan. |
All | Option 1 | Path 1 | Documentation showing outdoor air delivery systems with required energy recovery devices and efficiencies, and_OA_ bypass (e.g., mechanical schedules, specifications, submittals, controls diagram). |
All | Option 1 | Path 2 | The total project envelope UA calculation and percent improvement compared to baselines as defined in credit requirements. |
All | Option 1 | Path 2 | Comcheck or_ASHRAE_ 90.1-2022 prescriptive thermal bridging compliance forms (as applicable). |
All | Option 1 | Path 3 | Confirmation of air tightness testing and TAB in OPR and Cx plan. |
All | Option 1 | Path 3 | Air leakage test report describing method, conditions, and results. For renovation projects; Test results from before and after alterations for projects in existing buildings attempting to show air leakage reductions. |
All | Option 2 | All | Calculation showcasing achievement of point threshold. (Estimated Energy Use, Peak Demand, Storage Capacity, Peak Storage Capacity Relative to Peak Demand). |
All | Option 2 | All | Narrative documenting the automatic load management controls. |
All | Option 3 | All | Proof of enrollment in DR program. |
All | Option 4 | Path 1 | Identification of systems with automatic DR controls and calculation showing required thresholds have been met. |
All | Option 4 | Path 2 | Project total peak electricity demand and total percentage of load included in the load shedding program. |
All | Option 4 | Path 2 | Description of how the project will shed 10% of the peak demand for one hour and what triggers the event. (e.g., short narrative, Sequence of Operations, etc.). |
All | Option 4 | Path 2 | BAS sequence of operations illustrating demand management for building equipment. |