855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 289
Extracted Content

Materials and Resources Credit
CONSTRUCTION AND DEMOLITION WASTE DIVERSION
MRc5
1–4 points
INTENT
To reduce construction and demolition (C&D) waste disposed of in landfills and incineration facilities and to decrease pollution to the environment. To reduce the environmental impacts and embodied carbon of manufacturing new materials and products. To delay the need for new landfill facilities that are often located in frontline communities. To create green jobs and materials markets for building construction services.
REQUIREMENTS
| Achievement pathways | Points |
|---|---|
Commercial Interiors | 1–4 |
Construction and Demolition Materials Management Plan | |
AND | |
Diversion | 1–4 |
Comply with the following requirements:
Construction and Demolition Materials Management Plan
Develop and implement a C&D materials management plan and achieve points through diversion and recycling.
AND
Diversion (1–4 points)
Follow the materials management plan and provide a final waste management report detailing all waste generated, including disposal and diversion rates for the project. Calculations can be by weight or volume but must be consistent throughout. Points are awarded according to Table 1.
Divert C&D waste materials by employing strategies including off-site salvage, sourceseparation for single-material recycling, mixed C&D recycling, and industry/manufacturer takeback programs.
U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 278