Source-separated materials are considered 100% diverted for credit calculation purposes. These include:

  • Recovered materials sent to a single-material recycler.

  • Recovered materials sent for off-site salvage/reuse.

  • Materials sent to a qualifying manufacturer or industry take-back program.

  • Salvaged materials are valued at twice the diversion rate (200%) of other diverted materials for credit calculation purposes. Salvaged materials include recovered materials sent off-site for reuse. NOTE: Materials reused on-site contribute to MRc1: Interior Materials Reuse .

  • Mixed C&D materials sent to a processing facility for recovery must take the facility average recycling rate. Recycling rates not verified by a third party must assume a maximum of 35% recovery rate.

  • Materials destined for alternative daily cover or incineration/energy recovery are considered waste (0% diverted).

  • Exclude hazardous waste from calculations. Exclude on-site reuse from credit calculations (include in MRc1: Interior Materials Reuse credit).

  • Exclude excavated soil and land-clearing debris from calculations.

Table 1. Points for C&D diversion

Meet any criteria up to a total of 4 points:

PathwayThresholdsPoints
Path 1Divert at least 35% of the total construction and demolition materials. At
least 10% of diverted materials must be salvaged or source-separated and
sent to a single-material recycler(s).
1
Path 2
Divert at least 50% of the total construction and demolition materials. At
least 20% of diverted materials must be salvaged or source-separated and
sent to a single-material recycler(s).
2
Path 3Divert at least 65% of the total construction and demolition materials. At
least 30% of diverted materials must be salvaged or source-separated and
sent to a single-material recycler(s)
3
Path 4Salvage or source-separate and recycle these targeted materials: clean
gypsum, carpet, ceilings, and furniture. Targeted materials diversion must
exceed 10% of the total construction and demolition materials.
1
REQUIREMENTS EXPLAINED

This credit encourages projects to plan and make design changes that reduce waste during construction. It rewards behavior change that leads to increased quality of recycling and a higher potential for materials to be recovered during construction.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 279