855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 297

Extracted Content

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
Construction and
Demolition
Materials
Management Plan
AllProvide the Construction and Demolition Materials
Management Plan.

All

Diversion

Diversion
Provide the C&D Waste Diversion calculator.


All

Diversion

Diversion

Summary of waste tickets and confirmation that the
numbers reported correspond to all the tickets for the
project.

All

Diversion

Diversion

Confirmation that ADC is excluded from diverted waste
calculations (but is included in total construction and
demolition waste generated calculations).

All

Diversion

Diversion

Upload documentation with the facility average diversion
rate of any mixed C&D materials sent to a processing
facility. For those projects sending mixed C&D materials
to a processing facility that has third-party verified
recycling rates, include proof of the third-party recycling
rate and facility certification through an approved
program.
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 286