855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 313

Extracted Content

back doors, garage/parking level entries, emergency exits, connections between concourses, and atrium entries.

While the prerequisite only requires entryway systems at primary exterior entrances within the LEED project scope of work, projects may benefit from installing entryway systems at all exterior entrances of the building.

ENTRYWAY SYSTEM LENGTH AND DESIGN There are no length requirements for the entryway systems, but it is highly recommended to utilize the best practice length of at least 10 feet (3 m.) in the primary direction of travel, which allows for approximately two full steps per shoe from an average person.

Design the entryway system to accommodate and withstand specific climate conditions. Areas with high precipitation, for example, may need more absorbent mats made with mold- and mildew-resistant materials. If using rollout mats, consider selecting ones that have a solid backing. A nonporous backing captures dirt and moisture and helps prevent contaminants from collecting underneath the mat.

Regular cleaning and maintenance will extend the integrity of the entryway system. Projects are encouraged to provide routine care for these systems, which is typically weekly.

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
AllAllResults of regional and local air quality investigation, at
minimum, date and time of observations, a description of the
site, observed odors or irritants, and conclusions regarding
acceptability of the outdoor air quality.

All
AllAll
Indication of whether the building is in an area where the
national guideline is exceeded (outdoor air treatment is required
per_ASHRAE_ 62.1-2022, Section 6.1.4).

All
AllAll
Calculation documents for mechanical VRP, NVP and IAQP.

All
AllAllAir cleaning systems (if used): supporting documentation for
safety and effectiveness.

All
AllAll
IAQ Procedure: Air Quality Test Plan and Occupant Survey
Methodology

All
AllAll
IAQP: Completed air quality testing report including time, date,
testing methods complying with credit requirements, results and
limits of the tested contaminants in all locations, and lab
accreditation scope for VOCs.

All
AllAll
IAQ Procedure: Subjective Occupant Evaluation Results.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 302