855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 366
Extracted Content
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
All | Option 1. Pre- occupancy air testing | Path 1 and Path 2 | Completed air quality testing report, including time, date, testing methods complying with credit requirements, results and limits of the tested contaminants in all locations, and lab accreditation scope for Path 2 VOCs if applicable. |
All | Option 1. Pre- occupancy air testing | Path 1 and Path 2 | Evidence of testing locations. |
All | Option 1. Pre- occupancy air testing | Path 1 and Path 2 | Document confirming substantial completion of construction, highlighting the date. The intent is to confirm that construction was complete prior to the time/date of the air quality testing. |
All | Option 2. Continuous Indoor Air Monitoring | All | Evidence of monitoring locations and description of monitoring approach. |
All | Option 2. Continuous Indoor Air Monitoring | All | Specifications of building grade air monitors. |
REFERENCED STANDARDS
-
EPA Compendium Method IP-3, GB/T 18883-2002 (nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=30003ULE.txt)
-
EPA designated methods for Ozone (epa.gov/system/files/documents/2024-12/amtic-list- december-2024_final.pdf)
-
ISO IEC 17025 (iso.org/ISO-IEC-17025-testing-and-calibration-laboratories.html)
-
CDPH Standard Method v1.2-2017 (cdph.ca.gov/Programs/cls/dehl/ehl/Pages/AQS/VOCs.aspx)
-
Reset Air Accredited Monitors (reset.build/directory/monitors)
-
UL 2905 (shopulstandards.com/ProductDetail.aspx?productId=ULE2905_2_S_20230110)
U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 355