5.9.1.2 Verification of the Design and Installation of the Continuous Air Barrier. Where verification of the design and installation of the continuous air barrier is used for compliance in Section 5.4.3.1, it shall be determined in accordance with the following:
-
Requirements for a field inspection plan shall be included in the construction documents and shall include as a minimum the following:
- Schedule for periodic inspection(s)
- Continuous air barrier scope of work
- List of critical inspection items
- Inspection document requirements
- Provisions for corrective actions when needed
-
An independent third-party V&T provider in accordance with Section 4.2.5.1 shall conduct reviews and inspections as follows:
- A design review shall be conducted to verify and document compliance with the requirements in Sections 5.4.3 and 5.8.3.2.
- Periodic field inspection of the continuous air barrier materials and assemblies shall be conducted during construction while the continuous air barrier is still accessible for inspection and repair to verify and document compliance with the requirements of Sections 5.4.3.2 and 5.8.3 and the field inspection plan.
- Verification and FPT documentation shall comply with Section 4.2.5.1.2 and the field inspection plan.
- plan.Verification and “FUNCTIONAL PERFORMANCE TESTING” = VERIFY AB IS FUNCTIONING FPT documentation shall comply with Section 4.2.5.1.2 and the field inspection V&T PROVIDER CERT COMPLETION OF FPT PLAN DEFERRED FPT, TO OWNER. 5.9.1.3 Dynamic Glazing. Dynamic glazing operation shall be tested for conformance with the manu- facturer’s installation instructions.

AB DOC AB FENEST
“FUNCTIONAL PERFORMANCE TESTING” = VERIFY AB IS FUNCTIONING V&T PROVIDER CERT COMPLETION OF FPT PLAN DEFERRED FPT, TO OWNER.
5.9.1.4 Air Curtains. Air curtains shall comply with Section 10.4.5. 5.9.2 Commissioning. The energy performance of the building envelope shall be commissioned i n accordance with Section 4.2.5.2. Commissionin g reporting shall comply with Section 4.2.5.2.2.
Informative Note: See Informative Appendix E and Informative Appendix H for commissioning references and guidance.
70 ANSI/ASHRAE/IES Standard 90.1-2022 (I-P)