5.9.1.2 Verification of the Design and Installation of the Continuous Air Barrier. Where verification of the design and installation of the continuous air barrier is used for compliance in Section 5.4.3.1, it shall be determined in accordance with the following:
- plan.Verification and “FUNCTIONAL PERFORMANCE TESTING” = VERIFY AB IS FUNCTIONING FPT documentation shall comply with Section 4.2.5.1.2 and the field inspection V&T PROVIDER CERT COMPLETION OF FPT PLAN DEFERRED FPT, TO OWNER. 5.9.1.3 Dynamic Glazing. Dynamic glazing operation shall be tested for conformance with the manu- facturer’s installation instructions.

AB DOC AB FENEST
“FUNCTIONAL PERFORMANCE TESTING” = VERIFY AB IS FUNCTIONING V&T PROVIDER CERT COMPLETION OF FPT PLAN DEFERRED FPT, TO OWNER.
5.9.1.4 Air Curtains. Air curtains shall comply with Section 10.4.5. 5.9.2 Commissioning. The energy performance of the building envelope shall be commissioned i n accordance with Section 4.2.5.2. Commissionin g reporting shall comply with Section 4.2.5.2.2.
Informative Note: See Informative Appendix E and Informative Appendix H for commissioning references and guidance.