ASHRAE-90.1-2022- - Page 109
Extracted Content
vided showing that the pipe with the proposed insulation has no more heat transfer per foot than a steel pipe of the same size with the insulation thickness shown in the tables.
6.9 Verification, Testing, and Commissioning 6.9.1 Verification and Testing. HVAC control systems shall be tested in accordance with this section and Section 4.2.5.1. Testing shall verify that systems and control elements are calibrated, adjusted, configured, and operating in accordance with applicable requirements of Sections 6.3, 6.4, and 6.5. FPT and verification documentation shall comply with Section 4.2.5.1.2.
6.9.2 Commissioning. The performance of the mechanical systems shall be commissioned in accordance with Section 4.2.5.2. Commissioning reporting shall comply with Section 4.2.5.2.2.
Informative Note: See Informative Appendix E for commissioning references.
ANSI/ASHRAE/IES Standard 90.1-2022 (I-P) 107