ASHRAE-90.1-2022- - Page 187
Extracted Content
-
L03: 11.5.2.5.3, “Occupancy Sensor Control Areas”
- Q02: 11.5.2.7.2, “Efficient Kitchen Equipment” - Q03: 11.5.2.7.3, “Fault Detection and Diagnostics System” - G02: 11.5.2.8.2, “HVAC Load Management” - G03: 11.5.2.8.3, “Automated Shading Load Management” - G07: 11.5.2.8.7, “Building Thermal Mass”
-
The base credit for the measure shown in Tables 11.5.3-1 through 11.5.3-9 for the building use type and climate zone adjusted by proration factor or formula as stated in the measure description in this section. This applies to the following measures:
-
H02: 11.5.2.2.2, “HVAC Heating Performance Improvement”
-
H03: 11.5.2.2.3, “HVAC Cooling Performance Improvement”
-
H05: 11.5.2.2.5, “Ground-Source Heat-Pump System”
-
H06: 11.5.2.2.6, “Dedicated Outdoor Air System with Zone Fan Control”
-
W02: 11.5.2.3.1(b), “Heat-Pump Water Heater”
-
W03: 11.5.2.3.1(c), “Efficient Gas Water Heater”
-
W04: 11.5.2.3.2, “Service Hot-Water Piping Insulation Increase”
-
W09: 11.5.2.3.6, “Shower Drain Heat Recovery”
-
L02: 11.5.2.5.2, “Continuous Dimming and High-End Trim”
-
L04: 11.5.2.5.4, “Increased Daylighting Control Area”
-
L05: 11.5.2.5.5, “Lighting Control for Multifamily Buildings”
-
L06: 11.5.2.5.6, “Reduce Interior Lighting Power”
-
R01: 11.5.2.6, “On-Site Renewable Energy”
-
Q01: 11.5.2.7.1, “Efficient Elevator Equipment”
-
G01: 11.5.2.8.1, “Lighting Load Management”
-
G04: 11.5.2.8.4, “Electric Energy Storage”
-
G05: 11.5.2.8.5, “HVAC Cooling Energy Storage”
-
G06: 11.5.2.8.6, “Service Hot-Water Thermal Storage”
-
-
By direct formula, as stated in the measure description in this section. This applies to the following measure:
- E01: 11.5.2.1, “Improved Envelope Performance” 11.5.2.1 E01: Improved Envelope Performance. To achieve this credit, building envelope measures shall be installed to improve the energy performance of the project. Measure energy credits for improvement of the building envelope energy performance shall be determined based on the following:
EC E01 _ calc = 1000 EPF---------------------------------------------------- E01_base EPF E01_base - EPF prop -
where EC E01_calc = energy credits achieved for improved envelope performance EPF E01_base = base envelope performance factor calculated in accordance with Normative Appendix C EPF prop = proposed envelope performance factor calculated in accordance with Normative Appendix C 11.5.2.2 Improved HVAC Performance. To achieve these credits, equipment shall provide HVAC performance improvement in accordance with Section 11.5.2.2.2, 11.5.2.2.3, 11.5.2.2.4, 11.5.2.2.5, or 11.5.2.2.6. Equipment shall also meet applicable requirements of Sections 6.4 and 6.5. Credits shall be as shown in Section 11.5.3 or as specified in each subsection for building use types where base credits are included in Section 11.5.3 tables. Use of multiple credits from this section shall be allowed. 11.5.2.2.1 H01: HVAC System Performance Improvement (Reserved) 11.5.2.2.2 H02: HVAC Heating Performance Improvement. To achieve this credit, space heating equipment shall exceed the minimum heating efficiency requirements by 5% or more than listed in the tables in Section 6.8.1. The measure energy credit for heating efficiency improvement (EC HE ) shall be determined as follows:
= EC H02 _ base ------------0.05 -
EC H02 _ adj = EC H02 _ base
EI heat
ANSI/ASHRAE/IES Standard 90.1-2022 (I-P) 185