ASHRAE-90.1-2022- - Page 352

Extracted Content

Table H-3 Standard 90.1 Items to Verify (Continued)

SubsectionSubsection TitleStandard 90.1 Items to Verify for Proper Operation or InclusionStatus
6.5.1.1Air EconomizersOutdoor air and return air damper control sequence properly configured. High-
limit shutoff set properly. Damper leakage and relief air appropriate. Sensor
accuracy and calibration.
6.5.1.2Fluid EconomizersMaximum pressure drop (precooling coils, water-to-water heat exchanger).
Economizer control integration sequence with heating,mechanical cooling,
and inside humidity.
6.5.2.1Zone ControlsZone box minimum position and operating sequence,deadband, and_set points_
configured properly.
6.5.2.2Hydronic System ControlsTwo-pipe changeover control_dead band_ and hydronic heat-pump_system_
controls configured properly.
6.5.2.3/
6.5.2.4
Dehumidification/
Humidification
Humidistatic controls configured properly if applicable.
6.5.2.5Preheat CoilsControl sequence configured properly.
6.5.3.1Fan System Power
and Efficiency
Fans are within power limits or meet_efficiency_ requirements.
6.5.3.2Fan ControlFans are equipped with variable-speed drives or multispeed control where
required, and control sensors and sequence are properly implemented.VAV
static pressure_set point_ is_reset._
6.5.3.3Multiple-Zone VAV System
Ventilation Optimization
Control
Proper configuration of ventilation optimization controls for_VAV systems_.
6.5.3.4Parallel-Flow Fan-Powered
VAV Air-Terminal Control
Check for proper sequence control.
6.5.3.5Supply Air Temperature
Reset Controls
Proper operation of supply air_reset_ controls for multiple zone systems.
6.5.3.6Fractional Horsepower
Fan Motors
For smaller fans, ECM or equivalent_efficiency_ motors have speed control.
6.5.4.1Boiler TurndownBoiler turndown capability and plant load controls for multiple_boilers_ or
modulating burner operation.
6.5.4.2Hydronic Variable Flow
Systems
Hydronic systems are variable flow and equipped with_pump_ speed controls
where required.
6.5.4.3Chiller and Boiler IsolationOffline chillers and_boilers_ are properly isolated and_automatic_ controls
function as required.
6.5.4.4Chilled- and Hot-Water
Temperature Reset Controls
Hydronic temperature_reset_ controls are configured properly where required.
6.5.6Energy RecoveryEnergy recovery systems implemented where required for exhaust air_energy_
recovery and service hot-water heat recovery.
6.5.7Exhaust SystemsProper operation of kitchen and laboratory exhaust air systems where required
for demand ventilation including integration of makeup-air units with
performance testing at multiple flow rates.
6.5.8Radiant Heating SystemsRadiant heating system controls operate properly and are coordinated with
other zone controls.
6.5.10Door SwitchesDoor switches provide proper control integration.
6.5.11Refrigeration SystemsRefrigeration control elements are properly configured.

350 ANSI/ASHRAE/IES Standard 90.1-2022 (I-P)