Table H-3 Standard 90.1 Items to Verify (Continued)

SubsectionSubsection TitleStandard 90.1 Items to Verify for Proper Operation or InclusionStatus
6.9Verification, Testing, and
Commissioning
HVAC control_systems_ receive testing for proper operation in accordance with
Sections 6.9 and 4.2.5. See specific items in Sections 6.4 and 6.5.
7.4.4Service Water Heating
System Controls
Proper configuration of temperature and circulation_pump_ controls.
7.4.5.3Time SwitchesProper configuration of_pool_ heater and_pump_ controls.
8.4.2Automatic Receptacle ControlProper control integration of required receptacle and labeling of controlled
receptacles.
8.4.3Electrical Energy MonitoringProper assignment of electrical loads for required end-use monitoring.
9.4.1.1Interior Lighting ControlProper operation of lighting controls, including local control, bilevel control.
9.4.1.2Parking Garage Lighting
Control
Proper operation of parking lot lighting controls, including_occupancy sensor_,
time switch, and daylighting control.
9.4.1.3Special ApplicationsProper operation of lighting controls, including separate control of display,
accent, display case, hotel guest room, nonvisual, and demonstration lighting.
9.4.1.4Exterior Lighting ControlProper operation of exterior lighting controls, including parking area proximity
sensors, time switch, and photocell or astronomical time control.
9.9.1Verification and TestingRequired functional testing is completed for occupant sensors,automatic time
switches, and daylight responsive control. Include control items in Sections
9.4.1.1 through 9.4.1.4.
10.4.2Service Water Pressure
Booster Systems
Required functional testing is completed for service water pressure booster
system controls.
10.4.5Air CurtainsFunctional testing and adjustment per the_manufacturer’s_ installation
requirements
11.5.1Energy Credits RequiredAdequate_energy_ credits are included in the project to meet the requirements of
the_building_ type and climate zone.
11.5.2Energy Credits AchievedIf applicable, test or commission any items in the proposed_building_ not
already covered in Sections 5 through 10 required to achieve the_energy_
efficiency to meet the_energy_ credits required for the_building_ type and climate
zone.
12.2(d), and
G1.2.1(c)
(Energy cost budget and
performance paths)
If applicable, test or commission any items in the proposed_building_ not
already covered in Sections 5 through 10 required to achieve the_energy_
efficiency to meet the chosen performance path.

Commissioning processes and the chosen items to verify can vary based on many factors. Selection of items to verify will be based on the specific project requirements, specific systems, building configuration, and climate zone. Some items may not apply at all in particular buildings . If the Energy Cost Budget Method or Performance Rating Method is used for compliance, the items to verify include any additional efficiency features of the proposed building design that are required for the building to comply using the selected performance path. The list in Table H-3 includes both mandatory items and prescriptive items. The prescriptive items may be adjusted or traded off in one of the performance paths.

H5. COMMISSIONING DOCUMENTATION

The commissioning process typically results in the deliverables included in this section. There may also be interim partial deliverables (as noted in Table H-2) or online issue tracking systems. Standard 90.1 does not require all of these documents; however, they are all part of a complete commissioning process. Where Standard 90.1 has specific requirements, references to the relevant Standard 90.1 sections are included. A document not required by Standard 90.1 is flagged “NR by 90.1.” This section provides background on the general content of these documents, with information about how they support the goals of Standard 90.1.