ASHRAE-90.1-2022- - Page 397

Extracted Content

Table M-1 Addenda to ANSI/ASHRAE/IES Standard 90.1-2019 (Continued)

AddendumSectionsDescription of ChangesaASHRAE
Standard
Committee
Approval
Cosponsor
Approval
(IES)
ASHRAE
BOD/Tech
Council
Approval
ANSI
Approval
z9.1.4Lowers the wattage assigned for track lighting to reflect the predominate use of higher-efficiency LED technology.2/28/20222/25/2022N/A2/28/2022
aaG3.1.2.9, Table G3.1Corrects the SI fan power values in Appendix G to make them consistent with the rest of the standard.5/28/20215/4/2021N/A5/28/2021
ab3.2, 3.3, G3Clarifies the process for selecting baseline HVAC systems when using the Appendix G Performance Rating Method
(PRM); includes new acronyms to describe HVAC systems and a new definition for “residential associated HVAC zone.”
6/30/20216/9/2021N/A6/30/2021
ac3.2, 9.4.1.2, Table 9.2.3.1,
Table 9.6.1, Appendix E
Updates interior lighting power and minimum control requirements: adds a power exception for the germicidal function
in luminaires and sources, removes exceptions for casinos and parking garage daylight transition zone lighting, and
provides a definition for the latter item.
6/25/20226/17/20226/29/20227/29/2022
ad9Reorganizes Section 9, “Lighting,” to better parallel the structure of the other main sections.8/31/20218/26/2021N/A8/31/2021
ae8.4.4Updates exceptions and footnotes associated with Section 8.4.4 requirements for the minimum efficiency of low-voltage
dry-type transformers in commercial buildings.
8/31/20218/26/2021N/A8/31/2021
ag3.2, 3.3, 6.2.26.6,
Appendix K
Introduces an optional Mechanical System Performance Path that allows HVAC system efficiency trade-offs based on a
new metric—total system performance ratio (TSPR)—to ensure that equivalent energy savings are maintained
compared to the prescriptive approach.
7/20/20229/8/20228/15/20229/9/2022
ah7.5.3Increases the thermal efficiency required for high-capacity gas-fired service water-heating equipment and provides the
U.S. DOE criteria for defining high-capacity water heaters.
8/31/20218/26/2021N/A8/31/2021
ajTable G-1Updates Appendix G to align with Addendum ae clarifications related to baseline transformer performance.9/30/20219/27/2021N/A9/30/2021
akG3.1.1Provides criteria for determining when an HVAC zone should be isolated from a multizone system in the baseline
building model.
9/30/20219/27/2021N/A9/30/2021
am9.2.3.2, Table 9.2.3.2,
9.4.1.4, 9.4.2, Table 9.4.2-1,
Table 9.4.2-2
Modifies exterior lighting power and control requirements based on improvements in technology and revised lighting
practices; restructures portions of Section 9 to better communicate exceptions to those requirements.
incorrect reference to cavity spaces vs subject of narrative to right regarding lighting?
6/25/20226/17/20226/29/20227/29/2022
anTable G3.1Clarifies baseline HVAC fan schedule requirements for projects that rely on ventilation via operable windows that are
manually opened by the occupants.
9/30/20219/27/2021N/A9/30/2021
ao5.4.3.3.3, 6.4.3.9, 10.4.5,
Table H-3
Revises the requirements for air curtain units and controls and indicates that installation is to be performed in
accordance with the manufacturer’s instructions.
9/30/20219/27/2021N/A9/30/2021
ap3.2, 3.3, 4.2.1, 4.2.2, 9.9.1,
12.2, 13, Section 11
Introduces a new section to Standard 90.1 for the use of energy credits to enable an approximately 4% to 5% energy cost
savings. There are a total of 33 individual measures from which users can earn the required number of credits for their
building type and climate zone.
7/20/20229/8/20228/15/20229/9/2022
aq6.8.3, Table 6.8.3-1, Table
6.8.3-2, 7.4.3, Table 7-4
Introduces requirements for service water heating pipe insulation based on typical operating conditions.7/29/20227/26/2022N/A7/29/2022
ar3.2, Table 9.2.3.1, 9.4.4,
Appendix E
Adds requirements for indoor horticultural lighting based on a new metric, photosynthetic photon efficacy (PPE),
developed in ANSI/ASABE S640.
7/20/20229/8/20228/15/20229/9/2022
as4.2.4, 5.9, 6.9, 7.9, 8.9,
9.9, 10.9
Rearranges envelope inspection requirements and improves commissioning language throughout.1/27/20221/18/2022N/A1/27/2022
a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.a. These descriptions may not be complete and are provided for information only.