ASHRAE_Guideline_0-2019_ - Page 022
Extracted Content
-
Appendix N—Quality-Based Sampling Examples
-
Appendix O—Systems Manual
-
Appendix P—Training Manual and Training Needs
Appendices Q through X—In addition to the appendices (above) that are included in Guideline 0, The Commissioning Process, all supplemental technical guidelines should include the following appendices with specific technical topic guidance or requirements, as appropriate. It is the intent to have all technical guidelines use the same reference letter for each topic. That is, all examples of checklists would always be included in Appendix M. The technical Cx guidelines should include appendices that provide examples and guidance on the following topics or should include notes such as “Not used,” or “This appendix is intentionally left blank,” or “There is no supplemental information required.”
-
Appendix Q—Publications, Articles, References, Codes, Regulations, and Standards
-
Appendix R—Integration Requirements
-
Appendix S—Interference and Coordination with Other Systems and Assemblies
-
Appendix T—Communications: What, When, and Who
-
Appendix U—Test Procedures and Data Forms
-
Appendix V—Predesign Phase Commissioning Process Specific Needs
-
Appendix W—Design Phase Commissioning Process Specific Needs
-
Appendix X—Construction Phase Commissioning Process Specific Needs
-
Appendix Y—Occupancy and Operations Phase Commissioning Process Specific Needs
-
Appendix Z (and, if needed, Appendix AA and beyond) can be used as required for other topics that are determined to be useful for a specific assembly or system.
20 ASHRAE Guideline 0-2019