TRAINING AGENDA TOPICSCol2Col3Col4
(Suggested General Topics to Be Included)(Suggested General Topics to Be Included)(Suggested General Topics to Be Included)(Suggested General Topics to Be Included)
Suggested List of SubjectsSuggested List of SubjectsRequested by
D-I-R, Inc.
()
Desired
Duration, h
1.Overview and description of the purposes of the system
2.System troubleshooting: Description of diagnostic step-by-step procedures for determining the source
of problems on the system level; review technical service manual in detail
3.Component maintenance: Instruction of required procedures for weekly, monthly, and annual
preventive checks and timely repairs to preserve system integrity
4.Component troubleshooting: Description of diagnostic procedures for determining the source of
problems on the component level
5.Review of control drawings and schematics (have copies for attendees)
6.Start-up, loading, normal operation, unloading, shutdown, unoccupied operation, seasonal changeover,
etc., as applicable
7.Integral controls (packaged): Programming, troubleshooting, alarms, manual operation
8.Building automation system (BAS) controls: Programming, troubleshooting, alarms, manual
operation, interface with integral controls
9.Interactions with other systems, operation during power outage and fire
10.Relevant health and safety issues and concerns and special safety features
11.Energy-conserving operation and strategies
12.Any special issues to maintain warranty
13.Common troubleshooting issues and methods, control system warnings and error messages, including
using the control system for diagnostics
14.Special requirements of tenants for this equipment’s function
15.Service, maintenance, and preventive maintenance (sources, spare parts inventory, special tools, etc.)
16.Question and answer period
Total hours requestedTotal hours requested
Total hours required by specificationsTotal hours required by specifications