leed_checklist-1 (1) - Page 002
Extracted Content
LEED V4 RATING SYSTEM SELECTION GUIDANCE
Now that you know your facility meets the minimum requirements for LEED certification, it’s time to decipher which classification you fall under. Use this guide to assist in your planning.
Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements
| LEED FOR BUILDING DESIGN AND CONSTRUCTION Buildings that are new construction or major renovation. At least 60% of the project’s gross floor area must be complete by the time of certification. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | Col2 |
|---|---|
| BD+C: New Construction | New construction, high-rise residential of at least nine stories or major renovation of some building types (see exclusions here). |
| BD+C: Core and Shell | New construction or major renovation for plumbing units, electrical, mechanical and the exterior shell of a building, not an interior ft out. |
| BD+C: Data Centers | Buildings designed for computing equipment, servers and data storage. |
| BD+C: Healthcare | 24/7 hospitals providing inpatient and long term care. |
| BD+C: Hospitality | Hospitality buildings, with long or short term lodging, in the service industry. |
| BD+C: Retail | Showrooms, storage areas for customer service or buildings used for retail sales of product goods. |
| BD+C: Schools | Buildings on K-12 school grounds primarily consisting of learning spaces. |
| BD+C: Warehouses and Distribution Centers | Storage facilities for personal or commercial goods. |
| BD+C: Homes | Residential buildings, single or multi-family, of 1 to 3 stories. |
| BD+C: Multifamily Midrise | Multi-family buildings with more than 50% residential space, and between 4-8 stories. |
| LEED FOR INTERIOR DESIGN AND CONSTRUCTION Interior spaces that are a complete interior ft-out. In addition, at least 60% of the project’s gross foor area must be complete by the time of certifcation. | LEED FOR INTERIOR DESIGN AND CONSTRUCTION Interior spaces that are a complete interior ft-out. In addition, at least 60% of the project’s gross foor area must be complete by the time of certifcation. |
| ID+C: Commercial Interiors | None retail or hospitality interior spaces. |
| ID+C: Hospitality | Interior spaces, with long or short term lodging, in the service industry. |
| ID+C: Retail | Interior spaces used for customer service or retail sales of product goods. |