LEED V4 RATING SYSTEM SELECTION GUIDANCE
PDF Page 2
LEED V4 RATING SYSTEM SELECTION GUIDANCE
Now that you know your facility meets the minimum requirements for LEED certification, it’s time to decipher which classification you fall under. Use this guide to assist in your planning.
Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements
| LEED FOR BUILDING DESIGN AND CONSTRUCTION Buildings that are new construction or major renovation. At least 60% of the project’s gross floor area must be complete by the time of certification. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | Col2 |
|---|---|
| BD+C: New Construction | New construction, high-rise residential of at least nine stories or major renovation of some building types (see exclusions here). |
| BD+C: Core and Shell | New construction or major renovation for plumbing units, electrical, mechanical and the exterior shell of a building, not an interior ft out. |
| BD+C: Data Centers | Buildings designed for computing equipment, servers and data storage. |
| BD+C: Healthcare | 24/7 hospitals providing inpatient and long term care. |
| BD+C: Hospitality | Hospitality buildings, with long or short term lodging, in the service industry. |
| BD+C: Retail | Showrooms, storage areas for customer service or buildings used for retail sales of product goods. |
| BD+C: Schools | Buildings on K-12 school grounds primarily consisting of learning spaces. |
| BD+C: Warehouses and Distribution Centers | Storage facilities for personal or commercial goods. |
| BD+C: Homes | Residential buildings, single or multi-family, of 1 to 3 stories. |
| BD+C: Multifamily Midrise | Multi-family buildings with more than 50% residential space, and between 4-8 stories. |
| LEED FOR INTERIOR DESIGN AND CONSTRUCTION Interior spaces that are a complete interior ft-out. In addition, at least 60% of the project’s gross foor area must be complete by the time of certifcation. | LEED FOR INTERIOR DESIGN AND CONSTRUCTION Interior spaces that are a complete interior ft-out. In addition, at least 60% of the project’s gross foor area must be complete by the time of certifcation. |
| ID+C: Commercial Interiors | None retail or hospitality interior spaces. |
| ID+C: Hospitality | Interior spaces, with long or short term lodging, in the service industry. |
| ID+C: Retail | Interior spaces used for customer service or retail sales of product goods. |
PDF Page 3
| LEED FOR OPERATIONS AND MAINTENANCE Buildings that are fully operational and occupied for at least one year. The project may be undergoing improvement work or little to no construction. Must include the entire building’s gross floor area in the project. Source http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | Col2 |
|---|---|
| O+M: Existing Buildings | Non K-12 educational, retail, data centers, warehouses, distribution centers, or hospitality buildings. |
| O+M: Data Centers | Existing buildings designed for computing equipment, servers and data storage. |
| O+M: Hospitality | Existing hospitality facilities, with long or short term lodging, in the service industry. |
| O+M: Retail | Existing showrooms, storage areas for customer service or buildings used for retail sales of product goods. |
| O+M: Schools | Existing buildings made up of core and ancillary learning spaces on K-12 school grounds. May also be used for higher education and non-academic buildings on school campuses. |
| O+M: Warehouses and Distribution Centers | Existing buildings on K-12 school grounds primarily consisting of learning spaces. |
| LEED FOR NEIGHBORHOOD DEVELOPMENT New land development projects or redevelopment projects containing residential uses, nonresidential uses, or a mix. Projects may be at any stage of the development process, from conceptual planning through construction. It is recommended that at least 50% of total building foor area be new construction or major renovation. Buildings within the project and features in the public realm are evaluated. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | LEED FOR NEIGHBORHOOD DEVELOPMENT New land development projects or redevelopment projects containing residential uses, nonresidential uses, or a mix. Projects may be at any stage of the development process, from conceptual planning through construction. It is recommended that at least 50% of total building foor area be new construction or major renovation. Buildings within the project and features in the public realm are evaluated. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements |
| ND: Plan | Under construction or projects still within planning phases. |
| ND: Built Project | Finished development projects. |
| CHOOSING BETWEEN RATING SYSTEMS | CHOOSING BETWEEN RATING SYSTEMS |
| Step 1: | First, assign a rating system to each square foot or square meter of your building. |
| Step 2: | Calculate the percentage of your facility that meets each rating system. |
| Step 3: | Choose the most appropriate rating system based on the resulting percentages. |
| Rule 1: | Less than 40% of the gross foor area should not be used. |
| Rule 2: | Greater than 60% of the gross foor area should be used. |
| Rule 3: | Percentages between 40% and 60% of the gross foor area, then independently assess each situation and decide which rating system is most applicable. |