LEED FOR OPERATIONS AND MAINTENANCE
Buildings that are fully operational and occupied for at least one year. The project may be undergoing
improvement work or little to no construction. Must include the entire building’s gross floor area in the
project.
Source http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements
Col2
O+M: Existing BuildingsNon K-12 educational, retail, data centers, warehouses, distribution centers, or
hospitality buildings.
O+M: Data CentersExisting buildings designed for computing equipment, servers and data storage.
O+M: HospitalityExisting hospitality facilities, with long or short term lodging, in the service
industry.
O+M: RetailExisting showrooms, storage areas for customer service or buildings used for
retail sales of product goods.
O+M: SchoolsExisting buildings made up of core and ancillary learning spaces on K-12 school
grounds. May also be used for higher education and non-academic buildings on
school campuses.
O+M: Warehouses and
Distribution Centers
Existing buildings on K-12 school grounds primarily consisting of learning spaces.
LEED FOR NEIGHBORHOOD DEVELOPMENT
New land development projects or redevelopment projects containing residential uses, nonresidential
uses, or a mix. Projects may be at any stage of the development process, from conceptual planning
through construction. It is recommended that at least 50% of total building foor area be new
construction or major renovation. Buildings within the project and features in the public realm are
evaluated.
Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements
LEED FOR NEIGHBORHOOD DEVELOPMENT
New land development projects or redevelopment projects containing residential uses, nonresidential
uses, or a mix. Projects may be at any stage of the development process, from conceptual planning
through construction. It is recommended that at least 50% of total building foor area be new
construction or major renovation. Buildings within the project and features in the public realm are
evaluated.
Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements
ND: PlanUnder construction or projects still within planning phases.
ND: Built ProjectFinished development projects.
CHOOSING BETWEEN RATING SYSTEMSCHOOSING BETWEEN RATING SYSTEMS
Step 1:First, assign a rating system to each square foot or square meter of your building.
Step 2:Calculate the percentage of your facility that meets each rating system.
Step 3:Choose the most appropriate rating system based on the resulting percentages.
Rule 1:Less than 40% of the gross foor area should not be used.
Rule 2:Greater than 60% of the gross foor area should be used.
Rule 3:Percentages between 40% and 60% of the gross foor area, then independently
assess each situation and decide which rating system is most applicable.