| LEED FOR OPERATIONS AND MAINTENANCE Buildings that are fully operational and occupied for at least one year. The project may be undergoing improvement work or little to no construction. Must include the entire building’s gross floor area in the project. Source http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | Col2 |
|---|---|
| O+M: Existing Buildings | Non K-12 educational, retail, data centers, warehouses, distribution centers, or hospitality buildings. |
| O+M: Data Centers | Existing buildings designed for computing equipment, servers and data storage. |
| O+M: Hospitality | Existing hospitality facilities, with long or short term lodging, in the service industry. |
| O+M: Retail | Existing showrooms, storage areas for customer service or buildings used for retail sales of product goods. |
| O+M: Schools | Existing buildings made up of core and ancillary learning spaces on K-12 school grounds. May also be used for higher education and non-academic buildings on school campuses. |
| O+M: Warehouses and Distribution Centers | Existing buildings on K-12 school grounds primarily consisting of learning spaces. |
| LEED FOR NEIGHBORHOOD DEVELOPMENT New land development projects or redevelopment projects containing residential uses, nonresidential uses, or a mix. Projects may be at any stage of the development process, from conceptual planning through construction. It is recommended that at least 50% of total building foor area be new construction or major renovation. Buildings within the project and features in the public realm are evaluated. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements | LEED FOR NEIGHBORHOOD DEVELOPMENT New land development projects or redevelopment projects containing residential uses, nonresidential uses, or a mix. Projects may be at any stage of the development process, from conceptual planning through construction. It is recommended that at least 50% of total building foor area be new construction or major renovation. Buildings within the project and features in the public realm are evaluated. Source: http://www.usgbc.org/credits/existing-buildings/v4/minimum-program-requirements |
| ND: Plan | Under construction or projects still within planning phases. |
| ND: Built Project | Finished development projects. |
| CHOOSING BETWEEN RATING SYSTEMS | CHOOSING BETWEEN RATING SYSTEMS |
| Step 1: | First, assign a rating system to each square foot or square meter of your building. |
| Step 2: | Calculate the percentage of your facility that meets each rating system. |
| Step 3: | Choose the most appropriate rating system based on the resulting percentages. |
| Rule 1: | Less than 40% of the gross foor area should not be used. |
| Rule 2: | Greater than 60% of the gross foor area should be used. |
| Rule 3: | Percentages between 40% and 60% of the gross foor area, then independently assess each situation and decide which rating system is most applicable. |