LEED v5 BD+C Addenda Table - only_02-20-2026 - Page 004

Extracted Content

4

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
232EAp3: Fundamental
Commissioning
RequirementsDelete the final sentence of the 3rd sub-bullet:
“For envelope, include testing in the commissioning documents and witness a sample of tests (not required for Core and Shell
projects).”
2/20/2026
242EAp3: Fundamental
Commissioning
Requirements Explained > Table 1Delete the entire row for ‘Operations and Maintenance Manual’2/20/2026
246EAp3: Fundamental
Commissioning
Requirements Explained > Table 2Replace “Operations and Maintenance Manual” with “Systems Manual”2/20/2026
248EAp3: Fundamental
Commissioning
Requirements Explained >
Documentation
Replace the first row with:
“Provide the final or draft commissioning (Cx) report. If the report is a draft, include a list of incomplete tasks, and a plan for the
completion of commissioning and training addressing climatic and other conditions required for performance of any deferred
tests.”
Replace the fourth row with:
“Functional performance tests. Include at least one completed performance test script for each applicable discipline”
2/20/2026
252EAp4: Energy Metering and
Reporting
Requirements Explained >
Documentation
”Revise the second row to read as:
“Documentation showing monitoring and recording devices for each energy source serving the project, including renewable
energy and district energy (e.g. electrical plans, schedules, submittals, or other documents that detail the required monitoring and
recording devices)""

2/20/2026
259EAp5: Fundamental Refrigerant
Management
Requirements Explained >
Documentation
Revise the last row to read as:
“Confirm that all identified leaks are repaired, and that leaks detected in field-installed piping are fixed prior to charging
associated equipment with refrigerant.”
2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026