LEED v5 Building Design and Construction Addenda

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
53LTc1: Sensitive Land ProtectionDocumentation > Option 1 and 2Reword documentation table as noted below:
Option 1, row 1: “Documentation showing the previous development of the site.”
Option 1, row 2: “Vicinity map or aerial images showing the…”
Option 2, row 3: “Calculations showing estimated area of sensitive land avoided.”
Option 2, steep slopes, row 2: “Description of the…“
2/20/2026
55LTc2: Equitable DevelopmentAchievement Pathways Table >
Option 5
Requirements > Data Centers,
Warehouses, and Distribution
Centers
Requirements Explained > Data
Centers, Warehouses, and
Distribution Centers
Achievement Pathways Table:
- Delete Rows under Data Centers, Warehouses, and Distribution Centers: “Options 1, 2, and/or 3” and “AND”
- In the final row, in the right most column, add “1” as the point for Option 5.
Requirements:
- Under Data Centers, Warehouses, and Distribution Centers, delete “Options 1, 2, and/or 3” and “AND”
- Add “(1 Point)” to Option 5. Sensitive Project Location” title
- Revise requirements under Option 5 to read as: “Meet Option 1, 2, and/or 3 above and Locate the project building a minimum
of…”
Requirements Explained
- Under Data Centers, Warehouses, and Distribution Centers, add “Option 5. Sensitive Project Location”
- Delete the text “Meet Options 1, 2, and/or…”
- Revise second paragraph to read as: “Projects meet Options 1, 2, and/or 3 above and be at least 300 feet…“
2/20/2026
56LTc2: Equitable DevelopmentRequirements > Option 2 > Path 2
Requirements Explained > Option 2 >
Path 2

Requirements > Option 2 > Path 2, third bullet: Change ratio to “1.2:1”
Requirements Explained > Option 2 > Path 2 > 2nd paragraph: Change ratio to “1.2:1”
2/20/2026
63LTc2: Equitable DevelopmentDocumentation TablePlease review updated Reference Guide for all changes to the Documentation Table.2/20/2026
71LTc3: Compact and Connected
Development
Requirements > Option 1, Option 4,
Option 5
Healthcare section
Add a new sentence to the end of first line in Option 1: “Previously developed existing rural healthcare campus sites may
alternatively achieve one point with a minimum combined density, for the campus, of 30,000 square feet per acre (6,890 square
meters per hectare).”
Change Option 4 title to: “Connected Site” and delete all of Path 1, and the title of Path 2.
Change Option 5 title to: “Pedestrian Access (1-2 points)” and delete all of Path 1, and the title of Path 2.
Delete entire Healthcare section
2/20/2026
74LTc3: Compact and Connected
Development
Reference GuideSee February 2026 Reference Guide for all changes to this section.2/20/2026

February 20, 2026

PDF Page 2

Open page note

2

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
83LTc4: Transportation Demand
Management
Requirements > Transportation
Demand Assessment
- Change “Transportation Demand Assessment” to “Transportation Demand Management Assessment” for both the title of the
section and within the second paragraph.
- Revise 3rd bullet to read as “Assess transportation demand management strategies and low-carbon transportation options.”
2/20/2026
84LTc4: Transportation Demand
Management
Reference Guide ContentSee February 2026 Reference Guide for all changes to this section.2/20/2026
97LTc5: Electric VehiclesRequirements
Requirements Explained >
Documentation
Further Explanation
Requirements, Option 1
Change the 9 to an 8 in “has an accessible parking space at least 9 feet (2.5 meters) wide”
Documentation
In second row, change “9” to “8” feet
Further Explanation
Option 1, second bullet, first sub-bullet: change “nine” to “eight”
2/20/2026
99SSp1: Minimize Site DisturbanceTable of Contents, Rating System
Scorecards: Credit Category View,
Rating System Scorecards: Impact
Area View,
Sustainable Sites > The title of the
credit
Update all incorrect credit titles to “Minimize Site Disturbance”2/20/2026
114SSc3: Rainwater ManagementRequirements Explained > Rainfall
Event Calculations
Delete Footnote “15” from the last sentence of the section. This refers to a v4.1 Rainfall Event Calculator.2/20/2026
116SSc3: Rainwater ManagementRequirements Explained >
Documentation
Option 1
Rephrase as listed below:
Option 1 - row 1: “Calculations showing percentile of rainfall events retained.”
Option 1 - row 2: “Documentation identifying any end uses that the project meets through collection and reuse of rainwater.”
Option 1 - row 3: “Documentation depicting and explaining the site’s design conditions, including the overland flow paths of
rainwater, the topography, and the soil conditions. Documentation must also outline how the rainwater will be managed…”
Option 2
Rephrase as listed below:
Option 2 - row 1: “Documentation depicting the difference between the projected…”
Option 2 - row 3: “Documentation depicting and explaining the site’s design conditions, including the overland flow paths of
rainwater, the topography, and the soil conditions. Documentation must outline how the increase in runoff will be managed…“
2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 3

Open page note

3

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
125SSc4: Enhanced Resilient Site
Design
Requirements Explained > Flooding
Further Explanation > Flooding
Requirements Explained: Revise the last sentence of the Flooding section to read as: “Projects can choose to integrate all of the
components listed under “Critical Utilities,” as well as flood-resistant materials or certifying under a qualifying design standard.
Further Explanation > Flooding, revise third bullet to read as: “If Critical Utilities is chosen as one of the flood resilience strategies,
then each sub-bullet under Critical Utilities must be achieved.”
2/20/2026
127SSc5: Heat Island ReductionRequirements > Option 3. Tree
Equity
Further Explanation > Option 3
Requirements, Option 3:
-Add “and U.S. projects without a Tree Equity Score” after “For international projects” in the 1st sentence of 2nd paragraph
-Delete last sentence “Projects with no exterior work are exempt from this requirement.”
Further Explanation:
-Delete last bullet under Option 3: “Projects with no exterior work that increase tree plantings…“
2/20/2026
128SSc5: Heat Island ReductionRequirements Explained >
Documentation
Documentation Table, Option 1, 1st row: change “calculator” to “calculations”
Documentation Table, Option 3, 1st row: revise to read as “Evidence depicting areas of existing condition and design/post-
construction tree canopy cover on-site.”
2/20/2026
130WEp1: Water Metering and
Reporting
Further Explanation > Meters and
Types of Meters
Under Meters and Types of Meters, delete the last bullet: “Additions to existing buildings…“2/20/2026
146WEp2: Minimum Water
Efficiency, WEc2: Enhanced
Water Efficiency
WEp2 > Further Explanation > Option
2
WEc2 > Further Explanation > Option
1 and 2
WEp2 > Further Explanation > Option 2, Delete the 2nd bullet: “The calculations must include…”
WEc2 > Further Explanation > Option 1, 1st bullet, revise reference to LTc4, Option 2.
WEc2> Further Explanation > Option 2, add the following section:
“Option 2. Fixtures and Fittings - Calculated Reduction
■ The calculations must include all restroom fixtures necessary to meet the occupants’ needs (toilets, urinals, lavatories, and
showers) when seeking LTc4: Transportation Demand Management, Option 2. Active Travel Facilities, Path 2. Shower and
Changing Facilities.""
2/20/2026
160WEc1: Water Metering and Leak
Detection
Further Explanation > Option 1.
Submeters
Delete 3rd and 4th sub-bullet under the first bullet.2/20/2026
167WEc2: Enhanced Water
Efficiency
Requirements Explained >
Documentation > Option 4
Add a new row for Option 4, Path 1. Irrigation: “Provide documentation confirming that a permanent irrigation system is not
installed.”
Add a row for Option 4, Path 2: “USGBC Calculator”
2/20/2026
222EAp2: Minimum Energy
Efficiency
Requirements Explained >
Exceptions to Mandatory Provisions
Replace the 3rd bullet with: “‘Provisions that can be directly accounted for in ASHRAE 90.1, Appendix G PRM energy simulation.”2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 4

Open page note

4

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
232EAp3: Fundamental
Commissioning
RequirementsDelete the final sentence of the 3rd sub-bullet:
“For envelope, include testing in the commissioning documents and witness a sample of tests (not required for Core and Shell
projects).”
2/20/2026
242EAp3: Fundamental
Commissioning
Requirements Explained > Table 1Delete the entire row for ‘Operations and Maintenance Manual’2/20/2026
246EAp3: Fundamental
Commissioning
Requirements Explained > Table 2Replace “Operations and Maintenance Manual” with “Systems Manual”2/20/2026
248EAp3: Fundamental
Commissioning
Requirements Explained >
Documentation
Replace the first row with:
“Provide the final or draft commissioning (Cx) report. If the report is a draft, include a list of incomplete tasks, and a plan for the
completion of commissioning and training addressing climatic and other conditions required for performance of any deferred
tests.”
Replace the fourth row with:
“Functional performance tests. Include at least one completed performance test script for each applicable discipline”
2/20/2026
252EAp4: Energy Metering and
Reporting
Requirements Explained >
Documentation
”Revise the second row to read as:
“Documentation showing monitoring and recording devices for each energy source serving the project, including renewable
energy and district energy (e.g. electrical plans, schedules, submittals, or other documents that detail the required monitoring and
recording devices)""

2/20/2026
259EAp5: Fundamental Refrigerant
Management
Requirements Explained >
Documentation
Revise the last row to read as:
“Confirm that all identified leaks are repaired, and that leaks detected in field-installed piping are fixed prior to charging
associated equipment with refrigerant.”
2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 5

Open page note

5

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
275EAc1: ElectrificationRequirements Explained >
Documentation
Revise the first row to read as:
“Provide documentation of all heating, service water heating (SWH), solar water heating, process heating, and on-site electric
generation equipment within the project. Include information on the energy source (including district energy), equipment quantity,
capacity, and efficiency for each piece of equipment (e.g., mechanical, electrical, and/or plumbing schedules)“
Delete the following two rows from NC > Option 2 > Path 1:
“Total building space heating load at OA Temp 20*F or below."
"Provide a description of the basis of analysis for space heating loads.”
Add a row to “Core and Shell Only” for All:
“Excerpts from the applicable building code or tenant construction drawings confirming a weighted average COP of at least 1.8.”
Revise the last row to read as:
“District energy system(s) (DES):
Provide documentation and calculations demonstrating that the DES complies with the credit requirements at the district facility
(e.g., no on-site combustion, no on-site combustion except at low temperatures, and if district heating the weighted average
equipment COP).“
2/20/2026
285EAc2: Reduce Peak Thermal
Loads
Requirements Explained: New
Construction > Path 2. ASHRAE 90.1
Trade-off Methods > Envelope loads
Revise the third line to read as:
“Show the project achieves the required percentage improvement in the sum of system peak heating loads and system peak
cooling loads…“
2/20/2026
287EAc2: Reduce Peak Thermal
Loads
Requirements Explained >
Documentation
Please see the February 2026 Reference Guide for all changes to the Documentation Table.2/20/2026
329EAc4: Renewable EnergyRequirements Explained: Core and
Shell > Option 1
Under Option 1. Renewable Energy Supply or Procurement in the first sentence, change “2 points” to “4 points” for the
combination of Tier 1, Tier 2, and Tier 3 renewable energy.
2/20/2026
335EAc4: Renewable EnergyRequirements > Renewable Energy
Classifications > Tier 3
Under Tier 3, revise second bullet to be: Renewable fuels that are Green-e® Renewable Fuels certified or equivalent.2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 6

Open page note

6

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
340EAc5: Enhanced CommissioningRequirements Explained > Option 1 >
Path 1 > Timing of CxP engagement
Requirements Explained > Option 1 >
Path 2 > BECxP > Timing of BECxP
engagement.


Option 1 > Path 1 > Timing of CxP engagement
Delete the following sentence:
“If the CxP is engaged after pre-design, alternative measures must be taken to ensure alignment with the intent of the Standard
202 timeline.” and replace with the following sentence:
In certain scenarios, it may be possible for the CxP to be engaged after pre-design and still meet the intent of the ASHRAE 202
timeline.”
Option 1 > Path 2 > BECxP > Timing of BECxP engagement.
Delete the following sentence:
“If the BECxP is engaged after pre-design, alternative measures must be taken to ensure alignment with the intent of E2947-21a
timeline.” and replace with the following:
“In certain scenarios, it may be possible for the BECxP to be engaged after pre-design and still meet the intent of the E2947-21a
timeline.”
2/20/2026
344EAc5: Enhanced CommissioningRequirements Explained >
Documentation
Revise the first row to read as:
“Provide the final or draft commissioning (Cx) report. If the report is a draft, include a list of incomplete tasks, and a plan for the
completion of commissioning and training addressing climatic and other conditions required for performance of any deferred
tests.”
Revise the fourth row to read as:
Functional Performance Test scripts: Provide at least one completed performance test script for each applicable discipline.”
Revise the third row under Option 2 > Path 1 and Path 2 to read as:
“Upload showing a sampling of the visualizations from the EIS and/or FDD (e.g. screenshots or reports generated)“
2/20/2026
352EAc6: Grid InteractiveRequirements Explained >
Documentation > Option 4
Replace both rows for Option 4 with following:
“Provide a narrative and calculations addressing the following:
• A description of the critical equipment that requires continuous operation for the project.
• A description of the on-site renewable and energy storage systems, including the capacity of each system.
• Calculations and a description of the controls confirming the capability for the project to operate independently from the grid to
power the critical loads with the project’s onsite renewable and energy storage systems for at least three days (72 hours)“
2/20/2026
375MRp2: Quantify and Assess
Embodied Carbon
Requirements Explained > Results of
the Embodied Carbon Quantification
> High-priority embodied carbon
sources
Remove “and implemented” from the sentence: “For each of these key sources, explain how the team evaluated and implemented
project specific strategies to reduce their environmental impact.”
2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 7

Open page note

7

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
401MRc3: Low-Emitting MaterialsRequirements
Requirements Explained >
Calculating Product Category
Achievement
Requirements:
- In the first sentence, remove phrase “permanently installed products,”
- Under Flooring and Insulation product category, delete all instances of “membrane”
- Under Furniture product category, delete “permanently installed” from the second bullet.
Requirements Explained:
Delete “membrane” from the first sentence in the fourth paragraph.
2/20/2026
418MRc4: Building Product
Selection and Procurement
Requirements Explained > Table 2In the Flooring row:
-Strike Terrazzo flooring from the examples of products.
-Remove the ‘s’ from ‘Laminates Flooring’ example.
-Remove ‘Wood and composite’ from ‘Wood and composite wood subflooring’ example. Add ‘Reused solid’ before ‘wood.’
-Remove Wall base example.
In the Wall row remove the following examples:
- Cubicle wall
- Window treatments
2/20/2026

Addenda LEED v5 Building Design and Construction February 20, 2026

PDF Page 8

Open page note

8

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
487EQc3: Accessibility and
Inclusion
Requirements
Requirements Explained
BD+C:
Requirements > Accessibility for Social Health:
Change “single-use restroom OR one multi-use” to “single-user restroom OR one multi-user” in the second bullet.
BD+C and ID+C:
Requirements Explained > Table 3. or Table 2.
Change “single-use restroom OR one multi-use” to “single-user restroom OR one multi-user” in the second row.
2/20/2026
488EQc3: Accessibility and
Inclusion
Requirements ExplainedAdd “(ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE)” after RAMPS FOR ACCESSIBLE ROUTES AND
ENTRANCES, CLEAR WIDTH FOR HUMAN PASSAGE, and FRONT APPROACH WHEELCHAIR ACCESSIBLE SECTION
AND

Delete ” as mandated by the Americans with Disabilities Act (ADA) in the first sentence under RAMPS FOR ACCESSIBLE ROUTES
AND ENTRANCES (ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE)
2/20/2026
499EQc4: Resilient SpacesRequirements Explained >
Referenced Standards
Under Referenced Standards, delete the following three bullets:
- FEMA P-361 (fema.gov/sites/default/files/documents/fema_p-361_safe-rooms-
for

tornadoes-and-hurricanes_122024.pdf)
• FEMA E-74 (2011) (fema.gov/sites/default/files/2020-07/fema_earthquakes_reducing-
the

risks-of-nonstructural-earthquake-damage-a-practical-guide-fema-e-74.pdf)
• REDi Version 1.0 (redi.arup.com)“
2/20/2026
528EQc5: Air Quality Testing and
Monitoring
Requirements Explained > OPTION
2. CONTINUOUS INDOOR AIR
MONITORING > Monitor
Specifications
Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the last section of the
last sentence.
2/20/2026

*Shaded rows denote rating system changes.

Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and rating system

addenda effective at the time of the project’s registration date.

Addenda LEED v5 Building Design and Construction February 20, 2026