LEED v5 BD+C Addenda Table - only_02-20-2026 - Page 006
Extracted Content
6
| Page | Category and Prerequisite/Credit Name | Location | Issue | Post Date |
|---|---|---|---|---|
| 340 | EAc5: Enhanced Commissioning | Requirements Explained > Option 1 > Path 1 > Timing of CxP engagement Requirements Explained > Option 1 > Path 2 > BECxP > Timing of BECxP engagement. | Option 1 > Path 1 > Timing of CxP engagement Delete the following sentence: “If the CxP is engaged after pre-design, alternative measures must be taken to ensure alignment with the intent of the Standard 202 timeline.” and replace with the following sentence: In certain scenarios, it may be possible for the CxP to be engaged after pre-design and still meet the intent of the ASHRAE 202 timeline.” Option 1 > Path 2 > BECxP > Timing of BECxP engagement. Delete the following sentence: “If the BECxP is engaged after pre-design, alternative measures must be taken to ensure alignment with the intent of E2947-21a timeline.” and replace with the following: “In certain scenarios, it may be possible for the BECxP to be engaged after pre-design and still meet the intent of the E2947-21a timeline.” | 2/20/2026 |
| 344 | EAc5: Enhanced Commissioning | Requirements Explained > Documentation | Revise the first row to read as: “Provide the final or draft commissioning (Cx) report. If the report is a draft, include a list of incomplete tasks, and a plan for the completion of commissioning and training addressing climatic and other conditions required for performance of any deferred tests.” Revise the fourth row to read as: Functional Performance Test scripts: Provide at least one completed performance test script for each applicable discipline.” Revise the third row under Option 2 > Path 1 and Path 2 to read as: “Upload showing a sampling of the visualizations from the EIS and/or FDD (e.g. screenshots or reports generated)“ | 2/20/2026 |
| 352 | EAc6: Grid Interactive | Requirements Explained > Documentation > Option 4 | Replace both rows for Option 4 with following: “Provide a narrative and calculations addressing the following: • A description of the critical equipment that requires continuous operation for the project. • A description of the on-site renewable and energy storage systems, including the capacity of each system. • Calculations and a description of the controls confirming the capability for the project to operate independently from the grid to power the critical loads with the project’s onsite renewable and energy storage systems for at least three days (72 hours)“ | 2/20/2026 |
| 375 | MRp2: Quantify and Assess Embodied Carbon | Requirements Explained > Results of the Embodied Carbon Quantification > High-priority embodied carbon sources | Remove “and implemented” from the sentence: “For each of these key sources, explain how the team evaluated and implemented project specific strategies to reduce their environmental impact.” | 2/20/2026 |
Addenda LEED v5 Building Design and Construction February 20, 2026