LEED v5 BD+C Addenda Table - only_02-20-2026 - Page 008
Extracted Content
8
| Page | Category and Prerequisite/Credit Name | Location | Issue | Post Date |
|---|---|---|---|---|
| 487 | EQc3: Accessibility and Inclusion | Requirements Requirements Explained | BD+C: Requirements > Accessibility for Social Health: Change “single-use restroom OR one multi-use” to “single-user restroom OR one multi-user” in the second bullet. BD+C and ID+C: Requirements Explained > Table 3. or Table 2. Change “single-use restroom OR one multi-use” to “single-user restroom OR one multi-user” in the second row. | 2/20/2026 |
| 488 | EQc3: Accessibility and Inclusion | Requirements Explained | Add “(ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE)” after RAMPS FOR ACCESSIBLE ROUTES AND ENTRANCES, CLEAR WIDTH FOR HUMAN PASSAGE, and FRONT APPROACH WHEELCHAIR ACCESSIBLE SECTION AND Delete ” as mandated by the Americans with Disabilities Act (ADA) in the first sentence under RAMPS FOR ACCESSIBLE ROUTES AND ENTRANCES (ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE) | 2/20/2026 |
| 499 | EQc4: Resilient Spaces | Requirements Explained > Referenced Standards | Under Referenced Standards, delete the following three bullets: - FEMA P-361 (fema.gov/sites/default/files/documents/fema_p-361_safe-rooms- for tornadoes-and-hurricanes_122024.pdf) • FEMA E-74 (2011) (fema.gov/sites/default/files/2020-07/fema_earthquakes_reducing- the risks-of-nonstructural-earthquake-damage-a-practical-guide-fema-e-74.pdf) • REDi Version 1.0 (redi.arup.com)“ | 2/20/2026 |
| 528 | EQc5: Air Quality Testing and Monitoring | Requirements Explained > OPTION 2. CONTINUOUS INDOOR AIR MONITORING > Monitor Specifications | Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the last section of the last sentence. | 2/20/2026 |
*Shaded rows denote rating system changes.
Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and rating system
addenda effective at the time of the project’s registration date.
Addenda LEED v5 Building Design and Construction February 20, 2026