LEED v5 BD+C Rating System_November 2025_clean - Page 072
Extracted Content
| Lab Equipment | Requirement (IP) | Requirement (SI) |
|---|---|---|
| For 48 in sterilizer: 7.5 gal./U.S. tray | For 1,220 mm sterilizer: 28.35 liters/DIN tray | |
| Sterile process washer | 0.35 gal./U.S. tray | 1.3 liters/DIN tray |
| X-ray processor, 150 mm or more in any dimension | Film processor water-recycling unit | Film processor water-recycling unit |
Digital imager, all sizes | No water use | No water use |
To use Table 6, the project must be connected to a municipal or district steam system that does not allow the return of steam condensate.
Table 6. Compliant Municipal Steam Systems
| Steam System | Requirement |
|---|---|
| Steam condensate disposal | Cool municipally supplied steam condensate (no return) to drainage system with heat recovery system or reclaimed water |
OR | OR |
| Reclaim and use steam condensate | 100% recovery and reuse |
AND/OR
Option 4. Outdoor Water Use (1–2 points)
PATH 1. NO IRRIGATION (2 POINTS)
Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.
OR
PATH 2. EFFICIENT IRRIGATION (1–2 POINTS)
Reduce the project’s theoretical irrigation requirement (TIR) by at least 50% from the calculated baseline. Points are awarded according to Table 7.
Table 7. Points for Reducing Outdoor Water Use
| Percentage Reduction | Points |
|---|---|
| 50% | 1 |
| 100% | 2 |
AND/OR
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 65