Lab EquipmentRequirement (IP)Requirement (SI)
For 48 in sterilizer: 7.5
gal./U.S. tray
For 1,220 mm sterilizer: 28.35
liters/DIN tray
Sterile process washer

0.35 gal./U.S. tray

1.3 liters/DIN tray
X-ray processor, 150 mm or more in
any dimension
Film processor water-recycling unit
Film processor water-recycling unit

Digital imager, all sizes
No water useNo water use

To use Table 6, the project must be connected to a municipal or district steam system that does not allow the return of steam condensate.

Table 6. Compliant Municipal Steam Systems

Steam SystemRequirement
Steam condensate disposal
Cool municipally supplied steam condensate (no return) to
drainage system with heat recovery system or reclaimed
water

OR


OR

Reclaim and use steam condensate100% recovery and reuse

AND/OR

Option 4. Outdoor Water Use (1–2 points)

PATH 1. NO IRRIGATION (2 POINTS)

Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.

OR

PATH 2. EFFICIENT IRRIGATION (1–2 POINTS)

Reduce the project’s theoretical irrigation requirement (TIR) by at least 50% from the calculated baseline. Points are awarded according to Table 7.

Table 7. Points for Reducing Outdoor Water Use

Percentage ReductionPoints
50%
1
100%2

AND/OR