Table 18. Maximum Concentrations for Parameters in Condenser Water
| Parameter | Maximum Level |
|---|---|
| Ca (as CaCO3) | 600 ppm |
| Total alkalinity | 500 ppm |
| SiO2 | 150 ppm |
| Cl– | 300 ppm |
| Conductivity | 3,300 μS/cm |
Note: ppm = parts per million; µS/cm = micro siemens per centimeter.
Calculate the maximum number of cooling tower cycles by dividing the maximum allowed concentration level of each parameter by the actual concentration level of each parameter found in the potable makeup water analysis. Limit cooling tower cycles to avoid exceeding maximum values for any of these parameters.
The materials of construction for the water system that come into contact with the cooling tower water shall be of the type that can operate and be maintained within the cycles established in Table 19. Points are awarded according to Table 19.
Table 19. Points for Cooling Tower Cycles
| Cooling Tower Cycles | Points |
|---|---|
| Maximum number of cycles achieved without exceeding any maximum concentration levels or affecting operation of condenser water system. | 1 |
| Meet the maximum calculated number of cycles to earn 1 point and increase the number of cycles by a minimum of 25% by increasing the level of treatment and/or maintenance in condenser or makeup water systems. OR Meet the maximum calculated number of cycles to earn 1 point and use a minimum 20% alternative water. | 2 |
Meet the maximum calculated number of cycles to earn 1 point and increase the number of cycles by a minimum of 30% by increasing the level of treatment and/or maintenance in condenser or makeup water systems. OR Meet the maximum calculated number of cycles to earn 1 point and use a minimum 30% alternative water. | 3 |
Projects whose cooling is provided by district cooling systems are eligible to achieve Path 1 if the district cooling system complies with the preceding requirements.
OR
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 72