LEED v5 BD+C Rating System_November 2025_clean - Page 082

Extracted Content

ENERGY AND ATMOSPHERE

Energy and Atmosphere Prerequisite

OPERATIONAL CARBON PROJECTION AND DECARBONIZATION PLAN

EAp1

REQUIRED

New Construction Core and Shell

INTENT

To enable building stakeholders to visualize how their current design decisions will impact their project’s long-term operational carbon emissions and to ensure that stakeholders are planning for low-carbon outcomes from the project’s inception.

REQUIREMENTS

Achievement PathwaysPoints

New Construction and Core and Shell

N/A

Design Analysis

AND

AND

Site Energy Estimate

Site Energy Estimate

AND

AND

Review Carbon Projection

Review Carbon Projection

AND

AND

Decarbonization Plan

Decarbonization Plan

Path 1. Design for Electrification

Path 1. Design for Electrification

OR

OR

Path 2. Plan for Decarbonization

Path 2. Plan for Decarbonization

Comply with the following requirements.

Design Analysis

Analyze efficiency, peak load reduction, and decarbonization measures during the early stages of the design process and account for the results in design decision-making using at least one of the following methodologies:

  • Simplified energy modeling

  • Analysis from similar projects

  • Analysis from published data

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 75