LEED v5 BD+C Rating System_November 2025_clean - Page 084
Extracted Content
- Electrification readiness strategies incorporated into the initial design should be described along with a rough estimate of the avoided cost, avoided disruption, and avoided materials waste afforded by each readiness measure. Core and Shell projects should incorporate strategies to support tenant build-out and address future retrofits after tenant build-out. Some common readiness strategies include oversizing electrical panels and/or service or installing conduit for future loads, enhanced envelope, or heating distribution systems that can accommodate the lower temperatures of future heat pumps.
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 77