PATH 2. PLUG AND PROCESS LOADS (1–4 POINTS)
Case 1. Plug Load Management (1 point)
Implement the following:
-
Provide a plug load dashboard that is accessible through an application to all regular occupants of the building if tenants can opt out of displaying their plug loads to other tenants.
-
For building types and/or tenant types with IT departments, implement policies for PCs, monitors, and visual displays to be controlled off when not in use, except during scheduled maintenance periods.
AND/OR
Case 2. Efficient Plug and Process Load Equipment (1–4 points)
Install or reuse eligible plug and process equipment meeting the criteria in Table 2 for 90% of applicable equipment by quantity or rated load. Either include or exclude all eligible equipment reused in the project from the calculations.
-
For one, Table 2 equipment category (1 point)
-
For two, Table 2 equipment categories (2 points)
-
For three or more, Table 2 equipment categories (3 points)
OR
For process-intensive buildings, install or reuse eligible plug and process equipment meeting the criteria in Table 2 for at least 90% of total applicable equipment-rated load. Rated load of compliant equipment must total at least:
-
0.5 Watt (W)/sq. ft. (5.4 W/sq. m.) (3 points)
-
1.0 W/sq. ft. (10.8 W/sq. m.) (4 points)