Energy and Atmosphere Credit

RENEWABLE ENERGY

EAc4

New Construction (1–5 points): 100% of site energy use from any combination of Tier 1, Tier 2, and Tier 3 renewable energy is required for LEED Platinum projects. Core and Shell (1–4 points): 100% of base building energy use from any combination of Tier 1, Tier 2, and Tier 3 renewable energy is required for LEED Platinum projects.

INTENT

To encourage and recognize the use of renewable energy to reduce environmental and economic impacts associated with fossil fuel energy use and increase the supply of new renewable energy within the electrical grid, thereby fostering a just transition to a green economy.

REQUIREMENTS

Achievement PathwaysPoints

New Construction

1–5

Option 1. Renewable Energy Supply or Procurement

1–5

Core and Shell

1–4

Option 1. Renewable Energy Supply or Procurement

1–4

AND/OR


Option 2. Renewable Energy Readiness
1

Option 1. Renewable Energy Supply or Procurement (1–5 points New Construction, 1–4 points Core and Shell)

Supply or procure renewable energy meeting the renewable energy criteria referenced below. Points are rewarded according to Table 1.

Points documented for Tier 1, Tier 2, and/or Tier 3 renewable energy may be added together for a maximum of 5 points:

Table 1. Points for Renewable Energy Procurement for New Construction Projects

PointsTier 1Col3Col4Tier 2Tier 3
Points
Minimum Rated
Capacity*
ORPercent of
Annual Site
Energy

Percent of
Annual Site
Energy

Percent of
Annual Site
Energy
1A × 1 W/sq. ft.
(A × 10.8 W/sq. m.)
OR
5%

20%

50%
2
A × 2 W/sq. ft.
(A × 21.6 W/sq. m.)
OR10%40%100%