LEED v5 BD+C Rating System_November 2025_clean - Page 126
Extracted Content
o At least quarterly, MBCxP summary of anomalies and faults detected and
communication with facilities staff to discuss and prioritize issues
o At least annually, MBCxP summary reporting of trends, benchmarks, faults, energy
savings opportunities, corrective actions taken, and planned actions
o At least two MBCxP reviews of building systems, equipment, and operational
controls
AND
ENERGY INFORMATION SYSTEM
Provide a remotely accessible platform with software functionality to perform smart analytics and visually present all metered data referenced in EAp4: Energy Metering and Reporting, and to be expandable to include all tenant data referenced in EAp4: Energy Metering and Reporting . Include the following functionality:
-
Annual energy benchmarking of energy use intensities
-
Comparison of energy consumption to the prior interval annually and monthly, and for electric interval meters, daily and hourly
-
For electric interval data, hourly load shape with comparisons
-
Visualization and reporting of hourly electric submetered data
-
For tenant spaces > 10,000 sq. ft. (930 sq. m.), tenant portal with capability to provide visualization and reporting of:
o Base building data for shared systems serving the tenants and
o Tenant electricity energy use (excluding shared systems)
In addition, provide hourly monitoring and visualization of electric energy use for:
-
Elevators, escalators, and/or moving walkways.
-
Commercial kitchen equipment in spaces with more than 10 kW of rated capacity.
-
Process equipment in spaces with more than 10 kW of rated capacity.
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 119