LEED v5 BD+C Rating System_November 2025_clean - Page 144
Extracted Content
Option 3. Track Carbon Emissions from Construction Activities (1–2 points)
Earn points for tracking carbon emissions during construction activities according to Table 3.
Table 3. Points for Tracking Emissions During Construction Activities
| Pathway | Type of Construction-phase Emissions to Track | LCA Modules | Points |
|---|---|---|---|
Path 1 | Track all fuel and utility usage for contractor jobsite operations | A5 | 1 |
| Path 2 | Track all fuel and utility usage for contractor and subcontractor jobsite operations | A5 | 2 |
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, November 2025 Edition 137