LEED v5 ID+C Addenda Table - only_02-20-2026 - Page 001
Extracted Content
LEED v5 Interior Design and Construction Addenda
| Page | Category and Prerequisite/Credit Name | Location | Issue | Post Date |
|---|---|---|---|---|
| 50 | LTc2: Transportation Demand Management | Requirements | See February 2026 tracked changes Rating System document for all changes to this credit. | 2/20/2026 |
| 54 | LTc2: Transportation Demand Management | Reference Guide Content | See February 2026 Reference Guide for all changes to this section. | 2/20/2026 |
| 69 | LTc3: Electric Vehicles | Requirements | ID+C Requirements, Option 2 Change the 9 to an 8 in “has an accessible parking space at least 9 feet (2.5 meters) wide” | 2/20/2026 |
| 149 | EAc1: Electrification | Requirements > Option 4 > Table 2 | In the “Base building minimum threshold” column, shift whole scale 1 point down for row-‘O+M’. (6 points —> 5 points; 5 points —> 4 points; 4 points —> 3 points; 2 points —> 1 point.) | 2/20/2026 |
| 184 | EAc3: Renewable Energy | Requirements > Renewable Energy Classifications > Tier 3 | Under Tier 3, revise second bullet to be: Renewable fuels that are Green-e® Renewable Fuels certified or equivalent. | 2/20/2026 |
| 201 | EAc4: Enhanced Commissioning | Requirements Explained > Option 1 > Timing of CxP engagement | Option 1 > Timing of CxP engagement Delete the following sentence: “If the CxP is engaged after pre-design, alternative measures must be taken to ensure alignment with the intent of the Standard 202 timeline.” and replace with the following sentence: “In certain scenarios, it may be possible for the CxP to be engaged after pre-design and still meet the intent of the ASHRAE 202 timeline.” | 2/20/2026 |
| 229 | MRp1: Planning for Zero Waste Operations | Intent Requirements | Change all (6) instances of “building” to “project” in the Intent and Requirements. | 2/20/2026 |
| 258 | MRc3: Low-Emitting Materials | Requirements > Table 1 | In Table 1. Thresholds for Low-Emitting Materials: The first row (for 1 point) should remain the same. The second row (for 2 points) should read, “>90% of all products in each product category” The third row (for 3 points) should read, “>80% of all products in each additional product category” The fourth row (for 4 points) should read, “>80% of all products in each additional product category” | 2/20/2026 |
| 258 | MRc3: Low-Emitting Materials | Requirements Requirements Explained > Calculating Product Category Achievement | Requirements: - In the first sentence, remove phrase “permanently installed products,” - Under Flooring and Insulation product category, delete all instances of “membrane” - Under Furniture product category, delete “permanently installed” from the second bullet. Requirements Explained: Delete “membrane” from the first sentence in the fourth paragraph. | 2/20/2026 |
| 262 | MRc3: Low-Emitting Materials | Requirements Explained | Revise the the last two sentences of the second paragraph to read as: “Projects targeting two or four product categories must achieve low-emitting criteria for 90% or more of all products in each product category. Projects targeting six or eight product categories must achieve low-emitting criteria for 80% or more of all products in each additional product category.” | 2/20/2026 |
Addenda LEED v5 Interior Design and Construction February 20, 2026