LEED v5 ID+C Addenda Table - only_02-20-2026 - Page 002

Extracted Content

2

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
276MRc4: Building Product Selection
and Procurement

Requirements Explained > Table 1
In the Flooring row:
-Strike Terrazzo flooring from the examples of products.
-Remove the ‘s’ from ‘Laminates Flooring’ example.
-Remove ‘Wood and composite’ from ‘Wood and composite wood subflooring’ example. Add ‘Reused solid’ before ‘wood.’
-Remove Wall base example.
In the Wall row remove the following examples:
- Cubicle wall
- Window treatments
2/20/2026
339EQc3: Accessibility and InclusionRequirements ExplainedAdd “(ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE)” after RAMPS FOR ACCESSIBLE ROUTES AND
ENTRANCES, CLEAR WIDTH FOR HUMAN PASSAGE, and FRONT APPROACH WHEELCHAIR ACCESSIBLE SECTION
AND

Delete ” as mandated by the Americans with Disabilities Act (ADA) in the first sentence under RAMPS FOR ACCESSIBLE ROUTES
AND ENTRANCES (ONLY FOR PROJECTS IN REGIONS WITH NO ACCESSIBILITY CODE)
2/20/2026
341EQc3: Accessibility and InclusionRequirements ExplainedBD+C and ID+C:
Requirements Explained > Table 3. or Table 2.
Change “single-use restroom OR one multi-use” to “single-user restroom OR one multi-user” in the second row.
2/20/2026
356EQc5: Air Quality Testing and
Monitoring
Requirements Explained > OPTION
2. CONTINUOUS INDOOR AIR
MONITORING > Monitor
Specifications
Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the last section of the
last sentence.
2/20/2026

*Shaded rows denote rating system changes.

Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and rating system

addenda effective at the time of the project’s registration date.

Addenda LEED v5 Interior Design and Construction February 20, 2026