LEED v5 O+M Addenda Table - all_02-20-2026 - Page 002
Extracted Content
2
| Page | Category and Prerequisite/Credit Name | Location | Issue | Post Date |
|---|---|---|---|---|
| 62 | LTc1: Sustainable Transportation Performance LTc2: Transportation Demand Management | Referenced Standards | ”For Sustainable Transportation Performance, delete all referenced standards and replace with ”■ Walk Score (https://www.walkscore.com)“ For Transportation Demand Management, delete all referenced standards and replace with ”■ None"" | 2/20/2026 |
| 64 | LTc3: Electric Vehicles | Requirements Requirements Explained Documentation Further Explanation | Requirements Change the 9 to an 8 in “has an accessible parking space at least 9 feet (2.5 meters) wide” in the 5th bullet Requirements Explained > INSTALL ELECTRIC VEHICLES SUPPLY EQUIPMENT In final paragraph, change “9” to “8” in first sentence. Documentation In second row, change “9” to “8” feet Further Explanation Option 1, second bullet, first sub-bullet: change “nine” to “eight” | 2/20/2026 |
| 131 | EAc1: Greenhouse Gas Emissions Reduction Performance | Requirements > Renewable Energy Classifications > Tier 3 | Under Tier 3, revise second bullet to be: Renewable fuels that are Green-e® Renewable Fuels certified or equivalent. | 2/20/2026 |
| 164 | EAc5: Decarbonization and Efficiency Plans | Requirements > Option 1 | Replace the paragraph between Table 1 and Table 2 with the following: “Optional for High Performing Projects and High Process Load Projects Projects that earn a minimum of seven points in EAc2: Optimized Energy Performance or that have process loads that equal 30% or more of their site energy may meet the requirements in Table 2. For projects applying Table 2, only two points are available if on-site combustion is less than 25% of annual site energy.” | 11/3/2025 |
| 175 | EAc7: Commissioning | Requirements > Achievement Pathways Requirements > Option 2 > Path 2. Enhanced MBCx | Change the points for Option 2 > Path 2. Enhanced MBCx from (1 POINT) to (2 POINTS) | 11/3/2025 |
Addenda LEED v5 Operations and Maintenance February 20, 2026