LEED v5 Operations and Maintenance Addenda

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
5IPp1: Climate Resilience
Assessment
Requirements Explained >
Climate and Natural Hazard Risk
Assessment
In the second paragraph, revise the third sentence to read as: “For the purposes of this credit, natural hazards
include drought, earthquakes, extreme heat or cold, flooding, hurricanes and high winds, hailstorms,
landslides, sea level rise, storm surge, tornadoes, tsunamis, wildfires and smoke, and winter storms.”
11/3/2025
7IPp1: Climate Resilience
Assessment
Requirements Explained >
Referenced Standards
Replace the Referenced Standards with the following:
• Intergovernmental Panel on Climate Change, Working Group I, Sixth Assessment Report (https://interactive-
atlas.ipcc.ch/)
• FEMA National Risk Index (https://hazards.fema.gov/nri/)
• NOAA Climate Explorer (https://crt-climate-explorer.nemac.org/)
11/3/2025
7IPp1: Climate Resilience
Assessment
Requirements Explained >
Documentation
Revise “USGBC Climate Resilience Assessment Template” to “LEED v5 Climate Resilience Assessment
Template”
11/3/2025
20IPp2: Human Impact AssessmentRequirements Explained >
Documentation
Revise “USGBC Human Impact Assessment Template” to “LEED v5 Human Impact Assessment Template”11/3/2025
25IPp3: Operations Assessment and
Policy
Requirements > Operational
Elements > Green cleaning
In the last sentence, remove “and” where it appears before the word “staffing.”11/3/2025
26IPp3: Operations Assessment and
Policy
Requirements Explained >
Materials Purchasing
Delete “Programme for the Endorsement of Forest Certification (PEFC) 12” from the fourth bullet11/3/2025
31IPp3: Operations Assessment and
Policy
Requirements Explained >
Documentation
Remove the cell with the following language:
“The project’s operations assessment (using the USGBC Operations Assessment Template or equivalent)“
11/3/2025
32IPp4: Current Facilities
Requirements and O+M Plan
Requirements Explained >
Current Facilities Requirements
(CFR)
Revise the last sentence of the first paragraph to read as:
“It includes a property type description, occupancy and equipment run-time schedules, set points for HVAC
equipment, lighting levels, seasonal and time-based adjustments, and optional building plans.”
11/3/2025
38IPc1: Operational Planning for
Resilience
Requirements Explained >
Documentation
Add a second row with the following content:
“Confirmation that the emergency response plan was communicated to relevant service providers, facilities
staff, and occupants, including the points of contact for each procedure and protocol”
11/3/2025
42IPc2: Worker Safety and TrainingRequirements ExplainedDelete the following sentence from the second paragraph:
“Project teams are responsible for identifying which workers are included.”
11/3/2025
51LTc1: Sustainable Transportation
Performance
Requirements > Option 1 >
Equation 1
- Remove “the following” from Equation 1
- Add a heading: “Active and shared modes of transportation include:” above the bulleted list
- Add “preceding” in the final sentence
- Remove “above” in final sentence
11/3/2025

February 20, 2026

PDF Page 2

Open page note

2

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
62LTc1: Sustainable Transportation
Performance
LTc2: Transportation Demand
Management
Referenced Standards”For Sustainable Transportation Performance, delete all referenced standards and replace with ”■ Walk Score
(https://www.walkscore.com)“
For Transportation Demand Management, delete all referenced standards and replace with ”■ None""
2/20/2026
64LTc3: Electric VehiclesRequirements
Requirements Explained
Documentation
Further Explanation
Requirements
Change the 9 to an 8 in “has an accessible parking space at least 9 feet (2.5 meters) wide” in the 5th bullet
Requirements Explained > INSTALL ELECTRIC VEHICLES SUPPLY EQUIPMENT
In final paragraph, change “9” to “8” in first sentence.
Documentation
In second row, change “9” to “8” feet
Further Explanation
Option 1, second bullet, first sub-bullet: change “nine” to “eight”
2/20/2026
131EAc1: Greenhouse Gas Emissions
Reduction Performance
Requirements > Renewable
Energy Classifications > Tier 3
Under Tier 3, revise second bullet to be: Renewable fuels that are Green-e® Renewable Fuels certified or
equivalent.
2/20/2026
164EAc5: Decarbonization and
Efficiency Plans
Requirements > Option 1Replace the paragraph between Table 1 and Table 2 with the following:
“Optional for High Performing Projects and High Process Load Projects
Projects that earn a minimum of seven points in EAc2: Optimized Energy Performance or that have process
loads that equal 30% or more of their site energy may meet the requirements in Table 2. For projects applying
Table 2, only two points are available if on-site combustion is less than 25% of annual site energy.”
11/3/2025
175EAc7: CommissioningRequirements > Achievement
Pathways
Requirements > Option 2 > Path
2. Enhanced MBCx
Change the points for Option 2 > Path 2. Enhanced MBCx from (1 POINT) to (2 POINTS)11/3/2025

Addenda LEED v5 Operations and Maintenance February 20, 2026

PDF Page 3

Open page note

3

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
178EAc7: CommissioningRequirements ExplainedAdd a new section under Option 1:
“RETRO-COMMISSIONING SCOPE
The retro-commissioning scope should address the project’s energy-using systems (lighting, HVAC, controls,
etc., focusing on the end-uses that contribute most significantly towards total energy consumption as
estimated in EAp1: Estimated Energy Use and Operational Carbon Projection (plug and process systems are not
required to be commissioned, except where process energy dominates building usage; or the project has
central controls for these systems).”
Add a new paragraph in Option 2 before Path 2:
“It is not required for the Energy information systems (EIS) to be available for the full 12 month reporting period.
If the EIS is not available at the beginning of the reporting period, the MBCx summary report (including a
summary report of trends, benchmarks, faults, energy savings opportunities, and planned actions to facilities
management and/or building ownership) must cover the period the system is operational during the reporting
period, with a minimum of 3 months. Corrective action addressing anomalies or faults identified must be
initiated during the reporting period.”
2/20/2026
199MRc2: Waste Reduction StrategiesRequirements > Option 1Revise the last sentence of the Option 1 to read as:
“This pathway is available to projects that do not have an organics recycling/composting program prior to the
reporting period or projects seeking to expand an existing organic recycling program by introducing a new and
separate waste stream, such as adding composting for landscape clippings in addition to an existing indoor
food scrap recycling program.”
2/20/2026
220EQc1: Indoor Air Quality
Performance
RequirementsIn the Achievement Pathways Table, and Option 1, change the available points from “1-10” to “2-10”11/3/2025
224EQc1: Indoor Air Quality
Performance
Requirements Explained > Option
1. Continuous Indoor Air
Monitoring > Monitor
Specifications
Revise the second sentence to read as follows: “Monitors must meet the building grade requirements in Table 1
(based on RESET Grade B), be RESET Grade B accredited or validated UL 2095 Grade B. “
11/3/2025
224EQc1: Indoor Air Quality
Performance
Requirements Explained > Option
2. Targeted One-time Air Testing
and Option 3. Targeted One-time
Individual Organic Compounds
Testing > Table 5
Rename Table 5 from “Number of measurements required for Option 2 testing” to “Table 5. Number of
Measurements Required for Option 2 and Option 3 Testing”
11/3/2025

Addenda LEED v5 Operations and Maintenance February 20, 2026

PDF Page 4

Open page note

4

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
225EQc1: Indoor Air Quality
Performance
Requirements Explained >
OPTION 2. CONTINUOUS
INDOOR AIR MONITORING >
Monitor Specifications
Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the
last section of the last sentence.
2/20/2026
235EQc2: Ventilation PerformanceRequirementsRelocate the following sentence to be directly above Table 1 and add “(or opening sizes)”.
”If demonstrating exceedance from the referenced standard, increased outdoor air rates (or opening sizes) shall
be provided to 95% of all regularly occupied spaces.”
11/3/2025
236EQc2: Ventilation PerformanceRequirements Explained >
Increased Ventilation for
Mechanically Ventilated Spaces >
Determining the Increased
Ventilation Requirement
In the last sentence of the section, change “2026” to “2016”11/3/2025

*Shaded rows denote rating system changes.

Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and

rating system addenda effective at the time of the project’s registration date.