LEED v5 O+M Addenda Table - all_02-20-2026 - Page 003

Extracted Content

3

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
178EAc7: CommissioningRequirements ExplainedAdd a new section under Option 1:
“RETRO-COMMISSIONING SCOPE
The retro-commissioning scope should address the project’s energy-using systems (lighting, HVAC, controls,
etc., focusing on the end-uses that contribute most significantly towards total energy consumption as
estimated in EAp1: Estimated Energy Use and Operational Carbon Projection (plug and process systems are not
required to be commissioned, except where process energy dominates building usage; or the project has
central controls for these systems).”
Add a new paragraph in Option 2 before Path 2:
“It is not required for the Energy information systems (EIS) to be available for the full 12 month reporting period.
If the EIS is not available at the beginning of the reporting period, the MBCx summary report (including a
summary report of trends, benchmarks, faults, energy savings opportunities, and planned actions to facilities
management and/or building ownership) must cover the period the system is operational during the reporting
period, with a minimum of 3 months. Corrective action addressing anomalies or faults identified must be
initiated during the reporting period.”
2/20/2026
199MRc2: Waste Reduction StrategiesRequirements > Option 1Revise the last sentence of the Option 1 to read as:
“This pathway is available to projects that do not have an organics recycling/composting program prior to the
reporting period or projects seeking to expand an existing organic recycling program by introducing a new and
separate waste stream, such as adding composting for landscape clippings in addition to an existing indoor
food scrap recycling program.”
2/20/2026
220EQc1: Indoor Air Quality
Performance
RequirementsIn the Achievement Pathways Table, and Option 1, change the available points from “1-10” to “2-10”11/3/2025
224EQc1: Indoor Air Quality
Performance
Requirements Explained > Option
1. Continuous Indoor Air
Monitoring > Monitor
Specifications
Revise the second sentence to read as follows: “Monitors must meet the building grade requirements in Table 1
(based on RESET Grade B), be RESET Grade B accredited or validated UL 2095 Grade B. “
11/3/2025
224EQc1: Indoor Air Quality
Performance
Requirements Explained > Option
2. Targeted One-time Air Testing
and Option 3. Targeted One-time
Individual Organic Compounds
Testing > Table 5
Rename Table 5 from “Number of measurements required for Option 2 testing” to “Table 5. Number of
Measurements Required for Option 2 and Option 3 Testing”
11/3/2025