LEED v5 O+M Addenda Table - all_02-20-2026 - Page 004
Extracted Content
4
| Page | Category and Prerequisite/Credit Name | Location | Issue | Post Date |
|---|---|---|---|---|
| 225 | EQc1: Indoor Air Quality Performance | Requirements Explained > OPTION 2. CONTINUOUS INDOOR AIR MONITORING > Monitor Specifications | Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the last section of the last sentence. | 2/20/2026 |
| 235 | EQc2: Ventilation Performance | Requirements | Relocate the following sentence to be directly above Table 1 and add “(or opening sizes)”. ”If demonstrating exceedance from the referenced standard, increased outdoor air rates (or opening sizes) shall be provided to 95% of all regularly occupied spaces.” | 11/3/2025 |
| 236 | EQc2: Ventilation Performance | Requirements Explained > Increased Ventilation for Mechanically Ventilated Spaces > Determining the Increased Ventilation Requirement | In the last sentence of the section, change “2026” to “2016” | 11/3/2025 |
*Shaded rows denote rating system changes.
Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and
rating system addenda effective at the time of the project’s registration date.
Addenda LEED v5 Operations and Maintenance February 20, 2026