LEED v5 O+M Addenda Table - all_02-20-2026 - Page 004

Extracted Content

4

PageCategory and Prerequisite/Credit
Name
LocationIssuePost Date
225EQc1: Indoor Air Quality
Performance
Requirements Explained >
OPTION 2. CONTINUOUS
INDOOR AIR MONITORING >
Monitor Specifications
Under the Monitor specifications section, delete “Grade B” after “UL 2095” and change “2095” to “2905” in the
last section of the last sentence.
2/20/2026
235EQc2: Ventilation PerformanceRequirementsRelocate the following sentence to be directly above Table 1 and add “(or opening sizes)”.
”If demonstrating exceedance from the referenced standard, increased outdoor air rates (or opening sizes) shall
be provided to 95% of all regularly occupied spaces.”
11/3/2025
236EQc2: Ventilation PerformanceRequirements Explained >
Increased Ventilation for
Mechanically Ventilated Spaces >
Determining the Increased
Ventilation Requirement
In the last sentence of the section, change “2026” to “2016”11/3/2025

*Shaded rows denote rating system changes.

Note: The online version of the rating system takes precedent over the rating system portions of the LEED v5 project guidance and application; project teams are required to adhere to the rating system and

rating system addenda effective at the time of the project’s registration date.

Addenda LEED v5 Operations and Maintenance February 20, 2026